Similar Projects
William O. Huske Lock and Dam Esplanade Repair
Renovation
Design
$250,000 to $500,000 est. value
Fayetteville, NC

Construction of Devonwood Lower Dam
Post-Bid
Fayetteville, NC

Dam Remote Valve Operation System
Post-Bid
Raleigh, NC

Neuse River-Goldsboro Section 1135
Results
$5,000,000 to $10,000,000 est. value
Goldsboro, NC 27530

Lake Tabor Dam Spillway Repairs Project
Results
Tabor City, NC 28463

Falls Lake Dam, Vertical Lift Gate - Hydraulic Steel Structure Fabrication
New Construction, Term Contract
Post-Bid
NC

Boiling Spring Lakes Dam Construction/Reconstruction Project
Results
Southport, NC 28461

Greenfield Lake Spillway Repairs
Renovation
Post-Bid
Wilmington, NC

Tar River Reservoir WTP Dam Aeration
Results
Less than $100,000 est. value
Rocky Mount, NC

Rhodes Pond Dam Repair Project
Results
Raleigh, NC

Dutch Buffalo Dam Repairs
Results
$200,000 to $300,000 est. value
Mount Pleasant, NC 28124

Crabtree Creek Site 22B Lake Lynn Renovation
Renovation
Results
$136,809 est. value
Raleigh, NC

Solid Waste and Recycling Sediment Basin Improvements
Results
$200,000 to $299,000 est. value
Boone, NC

WC Dam 2 - Hatcher`s Grove Auxiliary Spillway Repair
Renovation
Results
Cary, NC

Lake Crabtree Dam 23 Renovation
Renovation
Results
$164,767 est. value
Cary, NC

Last Updated 05/03/2022 10:40 AM
Project Title

Hydraulic Steel Structure Fabrication of Vertical Lift Gate, Emergency Gate, and Service Gate

Physical Address View project details and contacts
City, State (County) State-Wide: NC
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Requirement: Work will consist of the following: fabricate, assemble, paint, and deliver two hydraulic steel structures. The work will primarily consist of two tasks: 1) fabricating and assembling gate structures; 2) shipment to the project. All work will be performed in accordance with the contract drawings and specifications. Work also involves preparing final “As-Built” documents. Falls Lake Dam emergency gate is a hydraulic steel structure and is classified as a vertical lift gate with dimensions 19-feet 10-inches in height and 9-feet 9-inches wide. The Falls Lake Dam service gate is a hydraulic steel structure and is classified as a vertical lift gate with dimensions 19-feet 8-inches in height and 9-feet 3-inches in width. The service gate has an attached 1-foot by 1-foot piggyback gate. The gates are constructed of structural steel members with skin plate on one side, seals and, a 45-degree bottom gate lip for hydraulic efficiency. Side and top seals are J-type rubber seals, and the bottom seals are rectangular. Six 16-inch diameter fixed wheels are mounted on cantilever axles on each side of each gate. The weight of each gate is approximately 17,000 pounds. Delivery shall be made to Falls Lake Dam located in Wake County North Carolina. Due to the critical nature of these structures and the specified framing arrangement many of the structural members are "Fracture Critical", therefore, all welding is required to be performed to AWS D1.5M/D1.5 welding code standard by a steel fabricator certified under the AISC Quality Certification Program, Category CBR (Major Steel Bridge) with a Fracture Critical Endorsement (F) or the new AISC Certification Program for Steel Bridge Fabricators (AISC 205-11) for "Intermediate Bridges" (IBR) meeting supplemental requirements for "Fabricators of Bridges with Fracture-Critical Members" (FC).

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Hydraulic Gates, Hydraulic Vertical Lift Gates, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents