Similar Projects
Mad River Pipeline Valve Replacement - City of Eureka
Alteration
Conception
$400,000 est. value
Eureka, CA

Bio Solids Dewatering - City of Eureka
Alteration
Conception
$1,542,000 est. value
Eureka, CA 95503

Storm Permanent Restoration
Infrastructure
Design
$4,090,000 CJ est. value
Blue Lake, CA 95525

Storm Permanent Restoration
Infrastructure
Design
$4,090,000 CJ est. value
Blue Lake, CA 95525

Hot Mix Asphalt (Type A), Structural Concrete, and Drilled Hole
Infrastructure
Bidding
$5,200,000 CJ est. value
Arcata, CA 95521

Humboldt Bay Trail South Project
Infrastructure
Bidding
$12,648,902 CJ est. value
Eureka, CA 95501

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

USACE SPK DBB Construction - Fire Retardant Pit and Taxiway Renovations
Infrastructure
Post-Bid
$100,000,000 CJ est. value
Redding, CA 96002

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

SRC Field House Turf Replacement
Infrastructure
Results
$229,988 CJ est. value
Arcata, CA 95521

Nordic Aquafarms / Samoa Peninsula
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Samoa, CA 95564

Y Street Drive Through Restaurant
New Construction, Infrastructure - 2,800 SF
Pending Verification
$1,000,000 CJ est. value
Eureka, CA 95501

Elk River Interpretive Center - City of Eureka
Alteration
Conception
$3,500,000 est. value
Eureka, CA

Rehabilitate Pavement
Infrastructure
Design
$11,945,000 CJ est. value
Blue Lake, CA 95525

Library Flat Roof Replacement
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Arcata, CA 95521

Last Updated 02/28/2023 06:07 PM
Project Title

Collector 2 Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Eureka, CA 95501   (Humboldt County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,064,500 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing: labor, materials, equipment, and supervision for installing, developing, disinfecting, and testing four new laterals, each 150 feet length. Work also includes the construction and installation of dewatering pond shown on plans and described in specifications. Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% Completion Date: 250 Calendar Days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents