Similar Projects
Univeter Road Mixed-Use Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Canton, GA 30115

Rope Mill Lane Climate-Controlled Self-Storage Facility
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Woodstock, GA 30188

Woodstock Xpress Park and Ride Lot Asphalt Paving
Infrastructure
Design
$300,000 est. value
Woodstock, GA 30189

Holly Springs City Hall
New Construction, Infrastructure - 16,000 SF
Design
$6,000,000 CJ est. value
Holly Springs, GA 30115

RFP Design - 2 New Northeast Cherokee Parks
Infrastructure
Bidding
$1,800,000 CJ est. value
Ball Ground, GA 30107

RFP Design - 2 New Northeast Cherokee Parks
Infrastructure
Bidding
$1,800,000 CJ est. value
Ball Ground, GA 30107

Carver Lane and Signal Installation
Infrastructure
Post-Bid
Lebanon, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Wiley Bridge Road at Cox Road Roundabout
Infrastructure
Results
GA

SR 92 at Neese Road Operational Improvement Project
Infrastructure
Results
Woodstock, GA 30188

Fire Station 15
New Construction - 12,342 SF
Construction
$5,316,000 est. value
Ball Ground, Canton, GA 30107

Hickory Flat Library Renovation and Additions - Rebid
Addition, Demolition, New Construction, Renovation, Infrastructure - 10,390 SF
Construction
$5,200,000 CJ est. value
Canton, GA 30115

Flatiron Building
New Construction - 4,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Woodstock, GA 30188

Prominence Point Parkway Apartment Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Canton, GA 30114

The Heights at Holly Springs
New Construction, Infrastructure - 25,000 SF
Conception
$115,000,000 CJ est. value
Holly Springs, GA 30115

Last Updated 07/10/2023 05:10 PM
Project Title

Heights At Ridgewalk

Physical Address View project details and contacts
City, State (County) Woodstock, GA 30188   (Cherokee County)
Category(s) Government/Public, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fire/Police Station, Multi-Family Homes, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $115,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for site work, paving and new construction of a fire station, neighborhood commercial pad, and 290 rental apartment units. As of July 10, 2023, a general contractor has not yet been assigned for this project. A firm construction timeline for this project has not yet been released.

Details

New Construction, New Construction. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents