Similar Projects
Salt Grass Point Farms Mini Storage
New Construction - 75,919 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Berlin, MD

Kent Narrows Boatel Phase II
New Construction - 12,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Chester, MD 21619

Westwood Self Storage
New Construction - 54,000 SF
Design
Salisbury, MD 21803

Aviation Way Business Center
New Construction - 145,920 SF
Design
Frederick, MD 21701

Construction of the Easton Utilities New Crew Building
New Construction - 6,855 SF
Bidding
Easton, MD 21601

Replace Equipment Shed at Hyattsville DC/MCS
Renovation
Bidding
Hyattsville, MD 20781

TPC Racing
New Construction - 38,600 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Jessup, MD 20794

Frederick Wine House
New Construction - 14,000 SF
Post-Bid
$4,000,000 est. value
Frederick, MD 21704

Gravity Axis, Fort George G. Meade, Maryland
- 145,857 SF
Results
$25,000,000 to $100,000,000 est. value
Fort Meade, MD 20755

Salt Storage Building
Results
Frederick, MD 21701

North East Gateway Warehouse
New Construction - 716,490 SF
Construction
North East, MD 21901

Bluegrass Self Storage
New Construction - 104,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Frederick, MD 21701

Amazon Delivery Station - Waldorf
Build-Out - 191,746 SF
Pending Verification
Waldorf, MD 20602

Parliament Place
New Construction - 366,312 SF
Pending Verification
$10,000,000 CJ est. value
Lanham, MD 20706

Warehouse at 7601 Energy Parkway
New Construction - 188,000 SF
Conception
$10,000,000 CJ est. value
Curtis Bay, MD 21226

Reported 02/24/2022 01:10 PM
Project Title

Construction of Salt Storage Facilities

Physical Address View project details and contacts
City, State (County) Lusby, Prince Frederick, MD 20678   (Calvert County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Complete as of January 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified Contractors to furnish all labor, material, equipment, supervision, and materials necessary for the construction of salt storage buildings

Details

12,660 SF - 1 Warehouse/Storage, 5,280 SF New Construction, 1 Warehouse/Storage, 7,380 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents