Similar Projects
Z--Mechanical, Electrical and Plumbing (MEP) Multiple Award Construction Contract
Design
$150,000 to $10,000,000 est. value

Elevator Maintenance
Post-Bid
Old Bridge, NJ 08857

Energy Savings Improvement Program
Post-Bid
North Brunswick Township, NJ

ESCO Energy Savings Improvements
Results
Perth Amboy, NJ

2018-2019 Boiler
Results
Less than $75,000 est. value
Monmouth Junction, NJ

Boiler and Hot Water Heater Maintenance and Repair Services
Term Contract
Post-Bid
Perth Amboy, NJ 08861

Rehabilitating Aeration Mixers Phase IV
Results
Sayreville, NJ 08871

Mechanical Refrigeration Maintenance at the Roosevelt Park Family Ice Rink
Term Contract
Post-Bid
New Brunswick, NJ

Boiler Maintenance and Repair Contractor
Term Contract
Results
NJ

Sludge Management Odor Control and Maintenance
Post-Bid
Sayreville, NJ 08871

Boiler Replacement at Parker Elementary School Project
Results
Middlesex, NJ 08846

District Boiler Service
Post-Bid
Middlesex, NJ 08846

Mechanical Maintenance and Repair Service
Results
Monroe Township, NJ 08512

NBHS Hot Water Heater Replacement
Post-Bid
$150,000 est. value
New Brunswick, NJ 08901

Water Heater Replacement
Results
Monroe Township, NJ 08831

Reported 09/04/2019 12:00 AM
Project Title

Startup, Shutdown, Maintenance and Inspection Of Compression System At The Ice Arena

Physical Address View project details and contacts
City, State (County) Old Bridge, NJ 08857   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Responsible for performing the startup of system. Open all valves, tighten all belts, lubricate all motors, clean out condenser tank, clean out nozzles, check for leaks, change filter (if needed), grease fan shaft bearings, startup compressors and make sure working properly.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Refrigerant Compressors, Packaged Compressor and Condenser Units, Packaged Air-Cooled Refrigerant Compressor and Condenser Units.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents