Similar Projects
Request for Contractor Prequalifications
Renovation, Infrastructure
Bidding
Thornton, CO

Construction of a Water Line Relocation
Infrastructure
Bidding
Aurora, CO

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

2022 Water System Improvement
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

37th Street Widening Phase 1
Infrastructure
Bidding
CO

2022 PRV Vault Improvement
Post-Bid
Aurora, CO

Aurora Reservoir Above Water 72 Inch Vault and East Tee
Results
$1,300,000 to $1,500,000 est. value
Aurora, CO

Advance Metering Infrastructure (AMI) System
Post-Bid
Thornton, CO

Large Valve Rehabilitation Task 2 (Prime Contractors)
Results
Less than $2,200,000 est. value
Aurora, CO 80012

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

On-Call Pipeline Construction Services
Term Contract
Results
Brighton, CO

Aurora Water Manhole Products (Cast Iron Covers, Rings, Frames and Grates)
Infrastructure
Post-Bid
Aurora, CO

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1
Results
Commerce City, CO 80022

Last Updated 02/15/2022 06:06 PM
Project Title

Huron Street Waterline Replacement

Physical Address View project details and contacts
City, State (County) Northglenn, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish, install, operate, monitor, maintain, and remove temporary dewatering and drainage systems as required. Lower and control water levels below pipe inverts to permit construction in the dry. B. Provide, maintain, and remove temporary surface water control measures to sufficiently drain and remove surface water before it enters any excavations, or grading. If surface water does enter excavation or grading, implement control measures so that it is adequately removed. C. Collect and properly dispose of all discharge water from dewatering and drainage systems. Discharge to a Sanitary Sewer System is not allowed.mD. Repair damage caused by dewatering and drainage system operations. E. Remove temporary dewatering and drainage systems when no longer needed. Restore all\ disturbed areas. F. Obtain, pay for, and comply with any and all required permits. CDPHE may take up to 30 days to respond to a permit request.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents