Similar Projects
Improvements to Fifteenth Avenue - Phase II
Infrastructure
Bidding
Belmar, NJ 07719

Improvements to Fifteenth Avenue - Phase II
Infrastructure
Bidding
Belmar, NJ 07719

Industrial Way West Roadway Improvements
Post-Bid
Eatontown, NJ

2019 Roadway Improvement Program
Post-Bid
Deal, NJ 07723

Improvements to Homestead Lane, Cedar Court, and Elm Court
Results
Roosevelt, NJ

Port Monmouth, Nj Phase 2, Contract 4A
Results
$2,000,000 to $3,000,000 est. value
Port Monmouth, NJ

2021 Road Improvement Program
Infrastructure
Bidding
Aberdeen, NJ

2020 Capital Improvement Program
Post-Bid
Union Beach, NJ 07735

Allentown Streetscape Phase II Project
Results
$416,974 est. value
Allentown, NJ

2021 Milling and Resurfacing Program
Infrastructure
Bidding
Aberdeen, NJ

FY 2019 Capital Road Improvement Program
Post-Bid
Colts Neck, NJ 07722

Improvements to 17th Avenue and Oak Terrace
Results
Lake Como, NJ 07719

Improvements to Farm Lane and School Lane
Infrastructure
Bidding
Roosevelt, NJ 08555

2020 Road Improvement Program
Post-Bid
Tinton Falls, NJ 07724

Improvements to Main Street Phase IV and North Boulevard
Results
Lake Como, NJ 07719

Last Updated 08/12/2021 05:09 AM
Project Title

First Avenue Improvements Phase I

Physical Address View project details and contacts
City, State (County) Manasquan, NJ 08736   (Monmouth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work for this Contract includes the installation of concrete curb and gutter throughout the project limits that will help reduce nuisance flooding. ADA upgrades will be completed where required, as well as repairs to sidewalk and driveway aprons as needed. The entire project area will be milled and overlayed upon completion of the improvements. The project will also include fire hydrant installation, relocation, and replacement. Distribution system water valve replacement, pavement striping, signage, and site restoration are also in the scope of work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents