Similar Projects
Last Updated | 08/21/2022 11:34 PM |
Project Title | Mapleview Street Green Streets |
Physical Address | View project details and contacts |
City, State (County) | Lakeside, CA 92040 (San Diego County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1765 Work to be Done: Consists in general of green street infrastructure to capture and retain stormwater runoff. Replacement of sections of undersized drainage pipes. Implementing curb, gutter and sidewalk with ADA ramps for pedestrians. The project will also include, but not limited to traffic control, trenching, shoring, connection to existing storm drain, sawcutting removal and replacement of asphalt concrete and concrete surfaces, and landscape and irrigation. The Owner will not be responsible for any oral interpretation of the meaning of the plans, specifications, or other pre-bid documents. Every request for such interpretation shall be in writing and forwarded via email to Jeff.Arciaga@sdcounty.ca.gov and to be given consideration must be received at least ten (10) days prior to the date fixed for the opening of bids. Any questions relative to this project, prior to execution of the Contract, should be directed to: JEFF ARCIAGA, Procurement Contracting Specialist Department of Purchasing and Contracting Email: Jeff.Arciaga@sdcounty.ca.gov In accordance with Board of Supervisors Policy "B-39a": Public Works Procurements estimated (by the County) to exceed $1 million: the prime contractor shall meet or exceed 3% DVB Subcontractor Participation goal. Public Works Procurements estimated (by the County) to exceed $500,000 but not $1 million: the prime contractor shall make a good faith effort to meet or exceed a 3% DVB Subcontractor Participation goal. Public Works Procurements estimated (by the County) to be $500,000 or less, DVB Subcontractor Participation is encouraged, but not required. DVB participation may be documented on page 2-10, but is not required at this estimate level. The County's estimated cost of the public work project is from $ 3,000,000 to $ 3,200,000 based on Total Bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Security: In the form of cash, or a certified or cashier's check, or a Bidder's Bond for at least ten percent of the bid amount executed by a company duly authorized to issue bonds in the State of California and certified by the U.S. Department of the Treasury shall accompany the bid. Performance and Payment Bonds: The successful bidder will be required to furnish a Performance Bond for one hundred percent, and a Payment Bond for one hundred percent of the Contract amount executed by a company duly authorized to issue bonds in the State of California and certified by the U.S. Department of the Treasury. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |