Similar Projects
HVAC Controller Replacement
Term Contract
Design
Offutt AFB, NE

Abrahams Library Air Handler Replacement
Alteration
Bidding
Omaha, NE 68134

Elliott Building Second Floor HVAC Replacement
Alteration
Bidding
$2,900,000 est. value
Scottsbluff, NE 69361

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Douglas County Health Center COVID-19 HVAC Upgrades Phase II
Alteration
Results
Omaha, NE 68105

Edith Abbott Memorial Library - Air Handler Replacement
Alteration
Results
Grand Island, NE 68801

HVAC Replacements (2) Units, Papillion La Vista High School(PLHS)
Alteration
Bidding
$135,000 est. value
Papillion, NE 68046

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Cooling Tower Repair-Fall 2021
Alteration
Results
Grand Island, NE

Dundy County Courthouse HVAC and Electrical Upgrades
Alteration
Bidding
$400,000 est. value
Benkelman, NE 69021

District Wide HVAC Maintenance Service
Term Contract, Alteration
Post-Bid
Gretna, NE

Bluff Road Landfill Facility HVAC Improvements
Alteration
Results
Lincoln, NE 68517

Annual Supply Daiken Heat Pumps
Term Contract
Post-Bid
Lincoln, NE

West Cooling Tower Replacement
Alteration
Results
Louisville, NE

Last Updated 05/23/2022 10:54 PM
Project Title

HVAC System

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a municipal facility in Hastings, Nebraska. Completed plans call for the renovation of a municipal facility. HVAC equipment and ductwork installed, remove and dispose of existing Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bid(s) received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. Technical Questions - Keith Miller, P.E. Project Engineer City of Hastings 1228 N. Denver Avenue PO Box 289 (68902) Hastings, NE 68901 Ph# 402-462-3549 Email: bidquestions@cityofhastings.org General Questions or Requests - Renae Griess Administrative Assistant - Engineering Dept, City of Hastings Ph# 402-462-3665 Fax# 402-462-3666 Email: bidquestions@cityofhastings.org

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents