Similar Projects
Last Updated | 07/18/2022 09:40 AM |
Project Title | Point Hudson Breakwater Replacement |
Physical Address | View project details and contacts |
City, State (County) | Port Townsend, WA (Jefferson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work required for this project includes: Facility improvements at the Point Hudson Marina as described below includes but is not limited to: Removing and upland disposal of the existing creosote timber pile, breakwater and bulkhead riprap, navigation aids, timber walkway, and steel piles. Installation of new steel breakwaters and bulkhead, consisting of steel pipe pile and riprap, habitat rock nursery, timber walkway (south breakwater), upland improvements, dredging, and navigation aids. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |