Similar Projects
Lockwood Folly Park Facilities - Brunswick County
Infrastructure
Conception
$3,800,000 CJ est. value
Bolivia, NC 28422

Northwest District Park - Brunswick County
Infrastructure
Conception
$5,690,000 CJ est. value
Leland, NC 28451

Bolivia Elementary School Stacking Lane
Infrastructure
Design
$80,000 CJ est. value
Bolivia, NC 28422

Cookout / Southport
New Construction, Infrastructure
Design
$300,000 CJ est. value
Southport, NC 28461

RFQ Design - Northeast Brunswick Regional Wastewater 2.5 MGD Plant Expansion - Phase 2
Addition, Demolition, Infrastructure
Bidding
$3,000,000 CJ est. value
Bolivia, NC 28422

Intersection Improvements at Us 17/ Sr 1136 (Red Bug Rd. And Us 17/ Sr 1345 (Royal Oak Rd.)
Infrastructure
Bidding
$3,000,000 CJ est. value
Shallotte, NC 28470

Ash - Waccamaw Multiuse Building - Brunswick County
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Ash, NC 28420

Cook Out / Southport
New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Southport, NC 28461

Community Center Site Improvements
Infrastructure
Results
$720,500 to $950,279 est. value
Saint James, NC

MOTSU Firefighting Water System
New Construction, Infrastructure
Results
$14,971,812 CJ est. value
Southport, NC 28461

Arbor Landing at Compass Pointe
New Construction, Infrastructure
Pending Verification
$4,417,660 CJ est. value
Leland, NC 28451

Novant Health Leland ASC
New Construction, Infrastructure
Pending Verification
$16,591,690 CJ est. value
Leland, NC 28451

Smithville Park Phase 3 - Brunswick County
Infrastructure, Renovation
Conception
$2,130,000 CJ est. value
Southport, NC 28461

Brunswick Bridge 104 Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$4,403,700 CJ est. value
Bolivia, NC 28422

Military Ocean Terminal Sunny Point (MOTSU) Berm Repair Construction Phase I
Infrastructure
Results
$3,807,849 CJ est. value
Southport, NC 28461

Last Updated 11/16/2022 07:01 AM
Project Title

Oak Island Building 801 Flooding Improvements

Physical Address View project details and contacts
City, State (County) Oak Island, NC 28465   (Brunswick County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $466,569 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of installing 470 square yards of permeable pavement, 1,165 square feet of stormwater management underground infiltration system, stormwater pump station with electrical control panel, associated storm drainage system, ABC stone and concrete pavement replacement, and dune vegetation replacement within Town right-of-way and Town parcels located near the Building 801. Any questions related to this bid may be addressed during the pre-bid meeting or directed in writing to the attention of Marc Horstman at mhorstman@wkdickson.com Bids must be submitted on the complete project and must be enclosed in a sealed envelope, addressed to Marc Horstman, Project Manager, WK Dickson & Co., Inc., 720 Corporate Center Drive, Raleigh, NC 27607, on behalf of Town of Oak Island. Outside of the envelope must be marked Bid for Oak Island Building 801 Flooding Improvements. Envelope must also bear, on the outside, the name of the bidder, bidders address, and bidders license number. All bids must be made on blank forms provided and included in the bound document or as provided by Addendum prior to bid. Project Location: Oak Island, NC For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents