Similar Projects
2021 Bond Program
New Construction, Renovation
Conception
Phoenix, AZ

New Dysart Elementary School 1
New Construction
Conception
AZ

Two Head Start/Early Childhood Education Buildings
New Construction
Design
San Carlos, AZ

Omega Alpha Academy - Outdoor Classrooms and Eating Areas
New Construction
Bidding
Douglas, AZ 85607

Construction Manager at Risk Services (CMAR)
Renovation
Bidding
Sahuarita, AZ

Construction Manager at Risk - Elementary School No. 32
Post-Bid
Phoenix, AZ 85083

Kiva Elementary School Rebuild/Remodel
New Construction
Post-Bid
$18,500,000 est. value
Paradise Valley, AZ 85253

New Killip Elementary School
Results
Less than $19,500,000 est. value
Flagstaff, AZ 86004

Garden Lakes Elementary School Renovations
Renovation
Results
$2,250,000 est. value
Avondale, AZ 85392

Cross of Glory School Addition
Addition
Construction
$17,860 est. value
Peoria, AZ 85383

General Contractors for the Demolition, Renovations and New Space at Pima Elementary School
Renovation, Demolition
Construction
$3,850,000 est. value
Pima, AZ 85543

New Dysart Elementary School 2
Demolition
Conception
AZ

Weatherization, Roofing, and Structural Repairs Project at Faras Elementary
Renovation
Post-Bid
Pirtleville, AZ

Ventana Vista Elementary School Building Restoration and Field Improvements Project
Results
Tucson, AZ 85750

Saint Gabriel New Church and School - Phase I
New Construction - 43,940 SF
Construction
$11,200,000 est. value
Phoenix, AZ 85331

Last Updated 07/15/2022 08:05 AM
Project Title

Construction Manager at Risk - Capital Improvements Project at Kirkland Elementary School

Physical Address View project details and contacts
City, State (County) Kirkland, AZ 86332   (Yavapai County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To build out during the next three (3) years to build 3,600 square feet of new construction, as well as demolition, grading and drainage, and significant site conditions.

Details

Elementary School, 3,600 SF Build-Out.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents