Similar Projects
Landfill Maintenance and Repair Services
Post-Bid
Camp Lejeune, NC 28547

Landfill Cells 2-6E Partial Closure Phase 3
Post-Bid
Wilmington, NC 28401

Active Gas Collection System
Results
Morganton, NC

Closed Holbrooks Road Landfill - Landfill Gas Remediation System
Results
Charlotte, NC

Landfill Recycling Area Improvements
Post-Bid
Less than $150,000 est. value
Graham, NC 27253

Cell 9 And 10A Construction
Results
Less than $4,317,314 est. value
Wilmington, NC 28401

Landfill Gas Analyzer
Post-Bid
Raleigh, NC 27695

Francis Farm Landfill - Restrictive Cover Design Plan
Results
$5,410,581 est. value
Waynesville, NC

Landfill Gas Remediation - Warren County Closed MSW Landfill
Post-Bid
NC

Solid Waste Landfill
Results
Butner, NC 27590

Construction of the Unit 1 Phase 2 Landfill Construction
Post-Bid
Dallas, NC 28034

Phases 5 and 6 Expansions of the Municipal Solid Waste (Msw) Landfill and the Horizontals Expansion of the Construction and Demolition (C&D) Landfill at Robeson County Landfill
Results
Saint Pauls, NC 28384

Implementation of the Remedial Action Plan - Hookerton Dump
Post-Bid
Hookerton, NC

MSW Landfill - Phase 6A
Results
Less than $4,756,817 est. value
Smithfield, NC 27577

Landfill Post Closure Maintenance and Repair
Post-Bid
Raleigh, NC 27614

Last Updated 11/14/2019 11:41 AM
Project Title

Landfill Gas Blower System

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the County's existing Landfill Gas Blower System at the North Wake Landfill (NWLF), as necessary, to create a fully functional and fully integrated Landfill Gas Blower System that accepts Landfill Gas (LFG) from the County's existing LFG Header and either discharges compressed LFG to the existing gas pipeline or to a LFG flare capable of handling the LFG flowrate for the life of the system. If selected, the successful party will enter into an agreement for the design, construction, and start-up of the Landfill Gas Blower System including but not limited to: prefabricated blower/open flare system, gas treatment system, and compressed air system all controlled by an integrated control system. Removal and Replacement of the existing Perennial Energy Inc. (PEI) Model No. GHS-1250-60 with a new blower/flare system rated to cover flow rates ranging from 1,500 standard cubic feet per minute (scfm) to 250 scfm, compatible with the existing controls.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents