Similar Projects
South Service Area Segment 4 and 10 Sewers
Infrastructure
Design
$5,518,000 CJ est. value
West Des Moines, IA 50265

Wastewater Reclamation Authority (WRA) Ingersoll Run Outlet Sewer, Phase 28, Segment 1
Infrastructure
Design
$19,499,000 CJ est. value
Des Moines, IA 50309

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

Sidewalk and Crossing Guard Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

Booneville Road - South 100th Street to South 115th Street
Infrastructure
Results
West Des Moines, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Results
West Des Moines, IA 50266

Camp Dodge Truck Entrance Road Rehab and Replacement
Renovation, Infrastructure
Post-Bid
Johnston, IA 50131

Last Updated 08/16/2022 10:08 AM
Project Title

2023 PCC Patching Project

Physical Address View project details and contacts
City, State (County) Windsor Heights, IA 50324   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $475,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consist of full depth PCC patching, partial depth patching and concrete sidewalk replacement Sealed proposals will be opened and bids tabulated at 10:00 AM on August 9, 2022, in the office of the City Clerk, City of Windsor Heights, 1145 66th Street Suite 1, Windsor Heights, IA 50324, with the results being reported to the City of Windsor Heights at its meeting at 6:00 PM on August 15, 2022 at which time the City Council may take action on the proposals submitted or at such time as may then be fixed. The City of Windsor Heights City Council reserves the right to reject any or all bids, to waive informalities or technicalities in any bid, and to enter into such contract, or contracts, as it shall deem to be to the best interest of the City of Windsor Heights

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents