Similar Projects
Last Updated | 09/21/2021 09:35 AM |
Project Title | Benjamin Franklin Lighting - Sidewalk Improvements Phase 2A |
Physical Address | View project details and contacts |
City, State (County) | Sarasota, FL (Sarasota County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Roadway Lighting, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of new 8-ft concrete sidewalk, driveway aprons, asphalt street reconstruction at three side streets to accommodate the new sidewalk ramps, and new curbing / curb and gutter at the reconstructed side streets and new driveway aprons. The Project also includes removal of landscaping and the relocation of signs along the street. The project corridor is approximately 5540-ft, located along the northeast side of Ben Franklin Dr. generally from Grant Dr. to northeast of Roosevelt Dr. The removal of existing street lights including poles, foundations, and accessories and the relocation of existing Sabal palm trees along the project corridor that will also include (under a separate construction project) installation of new street lights. Removal of existing lights will need to align with the Phasing plan of the new street light construction. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |