Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

RFQ- Construction Management At Risk Phoenix Deer Valley Airport Reconstruct Taxiway C Connectors C4-C10 CMAR Services
Infrastructure
Bidding
$7,486,500 CJ est. value
Phoenix, AZ 85027

RFQ- Construction Management At Risk Phoenix Deer Valley Airport Reconstruct Taxiway C Connectors C4-C10 CMAR Services
Infrastructure
Bidding
$7,486,500 CJ est. value
Phoenix, AZ 85027

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

AZ Flap Sr88(1) Apache Trail
Term Contract
Results
$12,000,000 to $15,000,000 est. value
Roosevelt, AZ 85545

Replacement Well Drilling
Infrastructure
Results
$5,500,716 CJ est. value
Mesa, AZ 85201

Palm Tower
New Construction - 79,190 SF
Construction
$8,352,485 est. value
Phoenix, AZ 85004

Mera Senior Living - Goodyear
New Construction - 660 SF
Construction
$8,470,063 est. value
Goodyear, AZ 85395

Signal Butte Water Treatment Plant Expansion (SBWTP)
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Mesa, AZ 85212

Southern Avenue and Country Club Drive Intersection Improvements - City of Mesa
Infrastructure
Pending Verification
$27,148,555 CJ est. value
Mesa, AZ 85201

Gentry on The Green
New Construction, Demolition - 156,000 SF
Design
$375,000,000 est. value
Scottsdale, AZ 85251

Last Updated 01/03/2024 08:35 AM
Project Title

South Pier at Tempe Town Lake - Phase One

Physical Address View project details and contacts
City, State (County) Tempe, AZ 85281   (Maricopa County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $300,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This phase is part of a larger, seven-phase development on 12.43 acres with plans for 2,460 residential units, 700,000 square-feet of commercial office and retail space, and 520 hotel rooms. Phase one consists of 3 apartment towers with 724 residential units and 26,000 square feet of retail space. Construction is underway on phase one. A construction timeline for additional phases has not been released.

Details

26,000 SF - New Construction, New Construction. 26,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents