Similar Projects
Pierce and 17th Avenue Crosswalk
Post-Bid
Lakewood, CO 80226

Idlewild Park Playground and Site Improvements
Post-Bid
Lakewood, CO

Concrete ADA Compliant Ramps at Campbell Cottages
Term Contract
Results
Arvada, CO 80005

Parking Lot Maintenance
Results
Golden, CO 80401

Broad View Acres Commercial Development-Site Development
New Construction
Construction
Lakewood, CO 80226

Sidewalk Improvements on 13th Avenue (Lamar Street West) and Wadsworth Boulevard (Mansfield Avenue South)
Post-Bid
Lakewood, CO 80226

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks
Post-Bid
Evergreen, CO 80439

Union and 6th Avenue On-Ramp Median Reconstruction
Results
Lakewood, CO 80226

Climbing Access Trail Construction
Post-Bid
CO

West 50th Avenue Sidewalk (SRTS) Between Fairmount Elementary & Mcintyre Street
Results
Golden, CO 80419

Sky Ranch Cab Filing 4 Wet Utilities Project
Post-Bid
Lakewood, CO 80227

Open Space North 40 Parking Lot Asphalt Replacement
Term Contract
Results
Less than $50,000 est. value
Golden, CO 80401

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

Last Updated 08/09/2021 06:40 PM
Project Title

Quail Street Park Site Improvements

Physical Address View project details and contacts
City, State (County) Lakewood, CO 80215   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 to $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails site work on property owned by Denver Water and leased to the City of Lakewood, for the purpose of adding park amenities for public use. The project also includes civil work in the Quail St. ROW to complete a section of curb & gutter and attached 5’-wide sidewalk. Site work consists of erosion and sediment control, demolition and removal of existing improvements, minor earthwork and grading, concrete work, sodding and native seeding, mulching, irrigation system modifications, site furnishings, and playground & resilient rubber surfacing installation. Civil work consists of clearing and grubbing, demo and removal, asphalt patching and paving, storm inlet adjustment, attached concrete sidewalk with vertical and mountable curb, sidewalk chase, and concrete curb ramp in City of Lakewood right-of-way. The project is to be completed within one hundred twenty (120) calendar days from the date of the Notice to Proceed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents