Similar Projects
Z--Replace Ceiling Tiles and Paint Stairwells
Term Contract
Design
$25,000 to $100,000 est. value
San Francisco, CA

Fireproofing Services
Alteration
Bidding
Calipatria, CA

General Services Steel Stairs Installation
Alteration
Bidding
Highland, CA 92346

UCLA MP 100 Suite 100 CT/MRI Replacement - Bid Package 08 Specialties
Alteration
Sub-Bidding
$4,450,000 est. value
Los Angeles, CA

Storefront Aluminum Wall Panel Material and Installation Services
Alteration
Post-Bid
Byron, CA 94514

Z2--Removal/Installation of Theater Acoustic Fabric
Term Contract
Post-Bid
Petaluma, CA 94952

Construction Services for the EIBJCWTP Fall Protection Improvements
Alteration
Results
American Canyon, Napa, CA 94503

Painting of Interior Vehicle Shop
Alteration
Results
Long Beach, CA 90806

Replace Interior Finishes GOGA National Park Service (NRA) at Fort Funston Building 101
Alteration
Bidding
$250,000 to $500,000 est. value
San Francisco, CA

PKC - 22 AS Blinds
Term Contract
Post-Bid
Fairfield, CA 94534

Santa Clara Convention Center Wall Coverings Project
Alteration
Results
Santa Clara, CA 95050

UCLA MP 100 Suite 100 CT/MRI Replacement - Bid Package 05 Acoustical Ceilings
Alteration
Bidding
$4,450,000 est. value
Los Angeles, CA

Install drapery system
Alteration
Post-Bid
$1,130,000 est. value
CA

CA State Railroad Museum Screen Wall
Alteration
Results
$50,000 to $150,000 est. value
Sacramento, CA 95814

Digester 7 Roof Repairs and Rehabilitation Project
Alteration
Bidding
$3,500,000 est. value
Ontario, CA

Last Updated 06/08/2022 05:30 AM
Project Title

Laboratory Casework Replacement at Orangewood Continuation High School

Physical Address View project details and contacts
City, State (County) Redlands, CA 92374   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents