Similar Projects
Asphalt Milling-Paving
Results
Rogers, AR

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

Design and Construction of Widening Greenhouse Road from Highway 12 to Highway 102
Infrastructure
Post-Bid
Bentonville, AR 72716

2021 Street Overlay
Infrastructure
Results
Bentonville, AR

2021 Mastic Sealer for City of Bentonville Streets
Infrastructure
Results
Bentonville, AR

Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

Highway 71B-12th-Tiger Intersection Improvements
Infrastructure
Post-Bid
Bentonville, AR

Oak Street and Uptown Overpass Improvements Project
Infrastructure
Post-Bid
Rogers, AR

Administrative Services Building -1000 SW 14th Street
Infrastructure
Post-Bid
Bentonville, AR

South J.B. Hunt Drive Extension - Pauline Whitaker Parkway - Bellview Road
Infrastructure
Post-Bid
Rogers, AR

Mercy Way Corridor Improvements
Infrastructure
Results
Bella Vista, AR

Statewide CLRS Improvements
Infrastructure
Results

8th Street Widening - SW I-Street to SE J-Street
Infrastructure
Post-Bid
Bentonville, AR

Pike Avenue Bike and Pedestrian Improvements
Infrastructure
Post-Bid
$400,000 to $475,000 est. value
Little Flock, AR

Hazelton Road Street Improvements
Infrastructure
Post-Bid
Pea Ridge, AR 72751

Reported 12/18/2021 12:00 AM
Project Title

Construction of 8th Street Widening SW I-Street to SE J-Street

Physical Address View project details and contacts
City, State (County) Bentonville, AR   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of approximately 7,273 linear feet of 8th Street from S.W. I-Street to S.E. J-Street in Bentonville, Arkansas. The reconstruction will widen the roadway to 4 and 5 lanes, provide new traffic signals, and replace the storm drainage systems for the length of project. The widened roadway will include vehicular lanes, a cycle-track or shared-use paths, and sidewalks. Minor utility relocations will be required to facilitate the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents