Similar Projects
Fire Station New Construction
New Construction
Results
$12,000,000 est. value
Boise, ID

Nampa Fire Station #6
New Construction
Bidding
$8,000,000 est. value
Nampa, ID 83686

Design Build Services - Fire Station 4 Project
New Construction - 10,000 SF
Results
Less than $4,000,000 est. value
Lewiston, ID 83501

Northwestern Region New Fire Station
New Construction
Conception
$8,800,000 est. value
Boise, ID

Fire Station 5 Rebuilding
New Construction
Conception
$12,500,000 est. value
Boise, ID

ISP New District #6 Facility
New Construction, Alteration - 23,000 SF
Results
$12,000,000 est. value
Idaho Falls, ID

Construction Manager/ General Contractor Services for Police Station Remodel
Renovation
Post-Bid
Coeur d'Alene, ID 83815

Sandpoint Police Department Remodel Project
New Construction
Results
$750,000 to $800,000 est. value
Sandpoint, ID

Police Headquarters
New Construction
Results
$20,000,000 est. value
Idaho Falls, ID

Last Updated 04/26/2022 05:50 AM
Project Title

Police Headquarters and Auxiliary Building

Physical Address View project details and contacts
City, State (County) Idaho Falls, ID 83401   (Bonneville County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of construction for a new 2 story police headquarters (main building) with workspace for patrol, forensics, interviews, climate-controlled evidence, vehicle inspections & storage including a sally port with K-9 unit. Staff amenities include physical agility, lockers, conference and meeting spaces, workspace, break areas and exterior courtyard. The building will consist of concrete masonry exterior, steel framing, insulated roofing, glazing and curtainwall entrance systems including concrete foundation, concrete floor slabs, complete HVAC, plumbing, electrical, lighting, AV, security, and information technology systems. Project includes construction of a new 1 story pre-engineered metal building (auxiliary building) for vehicle storage and SWAT workspaces and storages. This building will include an insulated envelope, concrete foundation, concrete floor slab, concrete aprons, complete HVAC, plumbing, electrical, lighting, security and information technology systems. Other project amenities included are a back-up generator, landscaping elements, equipment enclosures, outside storage building, secured perimeter access gates, open parking for staff and the public with provisions for future electric vehicle charging stations. Sitework to include water, sewer, gas, and technology systems. Project includes power service from source to the buildings.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents