Similar Projects
Reservation Telephone Cooperative Drive-Thru
Addition
Bidding
New Town, ND 58763

Waste Water Treatment Plant Administration Building 13 Re-Roof
Alteration
Bidding
Bismarck, ND

Roofing Envelope Services
Post-Bid

Roofing Envelope Services
Post-Bid

NDSU - Ladd Hall - 005 - Roof Replacement and Miscellaneous Upgrades
Results
Fargo, ND 58102

McClusky High School Re-Roofing
Renovation - 3,493 SF
Results
McClusky, ND 58463

2021 Jamestown City Hall Roof Replacement
Alteration
Bidding
$140,000 to $150,000 est. value
Jamestown, ND

Roofing IDIQ - Plains Area - North
Post-Bid
$10,000,000 est. value

NDSCS Schuett Hall Roof Replacement
Results
Wahpeton, ND 58075

Partial Roof Replacements Myhre and Roosevelt Elementary Schools
Post-Bid
Bismarck, ND 58501

NDSH GM Building Roof Replacement
Results
Jamestown, ND

Turtle Lake Mercer Public School Re-Roof
Post-Bid
Turtle Lake, ND 58575

Red River High School Skylight Replacement
Post-Bid
Grand Forks, ND 58201

Legacy High School Partial Roof Replacement
Post-Bid
Bismarck, ND 58503

MAYSA Roof
Post-Bid
Minot, ND

Last Updated 07/13/2021 05:54 PM
Project Title

Kostoe Hall Roof Replacement

Physical Address View project details and contacts
City, State (County) Valley City, ND 58072   (Barnes County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing ballast, membrane roofing, edge material, and scuppers. Cap metal at control joints to remail. Install: Insulation: 2 layers of 3.1” Isocyanurate (R-35) with tapered crickets adhered to the existing roof deck. Membrane: 60mil non-reinforced EPDM Membrane- fully adhered system. To include membrane flashing at wall, curbs, and other roof penetrations. Wood blocking: 2”x6” wood blocking at the perimeter and curbs to accommodate the height of the new insulation, if needed. Metal and/or Termination: 24 gauge. Prefinished edge metal, counterflashing, and scuppers. Reinstall the existing cap metal at the control joints. Warranty: Minimum 10-year membrane roof warranty Excludes: wood blocking, unless specifically called for above. Mechanical or electrical work necessary for roofing. Building permit.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents