Similar Projects
Coastal Storm Risk Management Ocean Isle Beach, NC
Bidding
$5,000,000 to $10,000,000 est. value
Kure Beach, Ocean Isle Beach, Wrightsville Beach, NC

Erosion Control Products
Infrastructure
Bidding
Raleigh, NC

CVCC Stream Bank Repair
Post-Bid
Hickory, NC 28602

WWTP Erosion Discharge Repair
Post-Bid
Clinton, NC

Dorothea Drive Drainage Improvements (Formal)
Results
Raleigh, NC

USDA FS NFsNC Tusquitee RD Shuler Creek Stream Restoration Project
Results
$25,000 to $100,000 est. value
Murphy, NC 28906

Carriage Park Entrance Culvert Rehabilitation
Construction
Hendersonville, NC 28791

W-5601DH 3rd and Dock Street
Infrastructure
Bidding
Wilmington, NC 28401

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

UT Morgan Creek Stream Restoration Project
Results
Carrboro, NC 27510

Grading, Paving, Drainage, and Structure at Bridge 108 over Middle Fork of the French Broad River on SR 1131 (Middlefork Rd)
New Construction, Infrastructure
Bidding
NC

Pathways Elementary School Exterior Drainage
Post-Bid
Hillsborough, NC 27278

Carteret Community College - Shoreline Stabilization Project
Results
Morehead City, NC 28557

Corrugated Aluminum Pipe
Infrastructure
Bidding
Greenville, Kinston, NC 28504

Stream Debris Removal: Stretches within the Lower Little River, Anderson Creek,and Upper Little River
Term Contract
Post-Bid
Lillington, NC

Last Updated 09/16/2021 10:45 AM
Project Title

Northern Dare County Beach Renourishment Project

Physical Address View project details and contacts
City, State (County) Manteo, NC   (Dare County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project comprises two distinct beach fill placement areas in four Towns, including: The placement of approximately 425,000 cubic yards of sand along 1.60 miles of shoreline in the Town of Duck; The placement of approximately 894,500 cubic yards of sand along 3.8 miles of shoreline in the Town of Southern Shores; The placement of approximately 643,000 cubic yards of sand along 3.97 miles of shoreline in the Town of Kitty Hawk; The placement of approximately 505,000 cubic yards of sand along 2.74 miles in the Town of Kill Devil Hills. In total, the project consists of the placement of approximately 2,467,500 cubic yards of sand along 12.1 miles of shoreline. The project can utilize sand from an existing Outer Continental Shelf (OCS) borrow site located off of the Town of Kill Devil Hills. The borrow area contains approximately 12,218,000 cubic yards.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents