Similar Projects
LA 1: Bayou Plaquemine Br Strengthening
Infrastructure
Design
$500,000 CJ est. value
Addis, LA 70710

LA 1: Bayou Plaquemine Br Strengthening
Infrastructure
Design
$500,000 CJ est. value
Addis, LA 70710

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Ernest Wilson Drive - Asphalt Repairs
Infrastructure
Post-Bid
$75,000 to $85,000 est. value
LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

LA 1/LA 415 Connector
New Construction, Infrastructure
Design
$175,000,000 CJ est. value
Port Allen, LA 70767

Ernest Wilson Drive - Concrete Repairs
Infrastructure
Post-Bid
$265,000 to $285,000 est. value
LA

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

Acadian Trail (West Baton Rouge)
Infrastructure
Design
$500,000 to $1,000,000 est. value
Addis, LA 70710

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

LA 1: Port Allen Canal Br Repl (Ph2)(Hbi)
Demolition, New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Port Allen, LA 70767

2022 Street Overlay
Infrastructure
Post-Bid
Brusly, LA

Improvements to Container Dock Joint and Pavement Repairs Port of Greater Baton Rouge
Infrastructure
Post-Bid
$650,000 CJ est. value
Port Allen, LA 70767

Last Updated 03/08/2023 06:02 AM
Project Title

Lafiton Lane Pavement Preservation

Physical Address View project details and contacts
City, State (County) Port Allen, LA 70767   (West Baton Rouge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement Asphalt Overlay Length 1.51 miles Parish : West Baton Rouge Estimated Cost Range $250,000 to $500,000 As of March 01, 2023, the project is in Design status. Anticipated letting date is November 08, 2023. LADOT - Lafiton Lane Pavement Preservation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents