Similar Projects
Salina ERCIP Photovoltaic Solar Power and Water Reduction
Alteration
Results
Less than $2,691,821 est. value
Salina, KS

ARCP Underground Hydronic Piping Upgrades
Alteration
Results
New Century, KS 66031

Piping Improvements and Water Meter Replacement
Renovation, Infrastructure
Post-Bid
Less than $1,250,000 est. value
Wichita, KS 67205

Facilities Management - (Electrical, Plumbing, Painting, Carpentry, HVAC ,Trenching and Masonry)
Term Contract
Results
KS

2022 JCPRD Mechanical and Plumbing Services IDIQ
Term Contract
Post-Bid
KS

On-Call Plumbing Services
Term Contract
Results
De Soto, Edgerton, Gardner, Leawood, Lenexa, Merriam, Mission, New Century, Olathe, Overland Park, Prairie Village, Roeland Park, Shawnee, Spring Hill, KS 66061

Jefferson County Jail Phase 1 Plumbing Fixture Replacement
Alteration
Post-Bid
$250,000 to $500,000 est. value
Oskaloosa, KS 66066

Temporary Bypass Pumping On-Call
Alteration
Post-Bid
Olathe, KS

Prairie Band Potawatomi Nation (PBPN) Health Center - Low Flow Water Saving
Alteration
Post-Bid
$400,000 est. value
Mayetta, KS 66509

Basehor Civic Campus - Mass Grading Project
Infrastructure
Bidding
$65,000 CJ est. value
Basehor, KS 66007

Turner Recreation Commission Plumbing Renovations
Renovation
Sub-Bidding
$500,000 CJ est. value
Kansas City, KS 66106

Last Updated 08/29/2022 01:32 AM
Project Title

Streambank Stabilization work at John Redmond #2

Physical Address View project details and contacts
City, State (County) Burlington, KS 66839   (Coffey County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Please NOTE: this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to this solicitation. If an offeror refuses to comply, they w ill be deemed not responsible. Streambank Stabilization work at John Redmond #2 Provide all labor, tools, and equipment to provide f or the streambank stabilization final features upstream of Toronto Dam on Verdigris River with a uniform and consistent transition application per scope of work. This work includes all aspects of streambank stabilization application on designated area of streambank within Woodson County, Kansas. This acquisition is solicited as 100% small business set-aside. The NAICS Code for this project is 237990, Other Heavy and Civil Engineering Construction. Size Standard: $39.5 million is $39,500,000.00. Also see FAR 52.204-8. In accordance with FAR 36.204, the magnitude of this construction contract is between $100,000 and $250,000. The government POC for this requirement is Mr. Terry Hawkins, Contract Specialist: (email) Terry.L.Haw kins@usace.army.mil (phone) 918-669-7022 Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to this solicitation. If an offeror refuses to comply, they w ill be deemed not responsible. Streambank Stabilization work at John Redmond #2 Provide all labor, tools, and equipment to provide f or the streambank stabilization final features upstream of Toronto Dam on Verdigris River with a uniform and consistent transition application per scope of work. This work includes all aspects of streambank stabilization application on designated area of streambank within Woodson County, Kansas. This acquisition is solicited as 100% small business set-aside. The NAICS Code for this project is 237990, Other Heavy and Civil Engineering Construction. Size Standard: $39.5 million is $39,500,000.00. Also see FAR 52.204-8. In accordance with FAR 36.204, the magnitude of this construction contract is between $100,000 and $250,000. The government POC for this requirement is Mr. Terry Hawkins, Contract Specialist: (email) Terry.L.Hawkins@usace.army.mil (phone) 918-669-7022 GENERAL DESCRIPTION OF WORK The objective of this project is to efficiently and effectively complete all work in accordance with this scope of work, the attached drawings, the specifications, and all other contract documents and requirements. The final result will be providing the streambank stabilization final features upstream of Toronto Dam on Verdigris River with a uniform and consistent transition application per scope of work. This work includes all aspects of streambank stabilization application on designated area of streambank within Woodson County, Kansas.. 1.2. GOVERNMENT SECURITY REQUIREMENTS The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either precontract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions. USACE Tulsa District Point of Contact is Mr Terry Hawkins W912BV22Q0101 Page 5 of 50 Phone: 918-669-7022 Email: Terry.L.Hawkins@usace.army.mil 1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS Copies of the solicitation and any amendments will be provided electronically to the contractor. If the files are too large to transmit via an email, shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. 1.4. OFFEROR'S QUESTIONS AND COMMENTS All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet no later than 7 calendar days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers. The bidder inquiry key for this project is R42YJG-6IWZZM. Instructions for registering in the ProjNet Bidder Inquiry system are available on the above website. 1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE The NAICS Code selected for this project is 237990, Commercial and Instutional Building and Construction, and the size standard is $39,500,000.00. Also see FAR 52.204-8. 1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal 1.7. SITE VISIT The vendor is highly encouraged to attend a site visit. To schedule a site visit and obtain the location address and facility entry information, please contact the following: TBD *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents