Similar Projects
Meadia Heights Golf Course Pool and Restaurant
New Construction, Renovation - 1,800 SF
Design
Lampeter, PA 17537

Fritz Avenue Subdivision
New Construction
Design
Quarryville, PA 17566

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

East Main Street Roadway Project - Concrete Sidewalk
Infrastructure
Post-Bid
Ephrata, PA 17522

Lancaster Brubaker / Fulton Parking Expansion
Results
$500,000 to $999,999 est. value
PA

Spruce Alley Improvements
Results
$100,000 to $135,000 est. value
Ephrata, PA 17522

Brent L Miller Jewelers
Infrastructure
Pending Verification
Lancaster, PA 17601

A Plus Landscaping
Infrastructure
Pending Verification
Reinholds, PA 17569

East Main Street Roadway Project - Concrete Curb
Infrastructure
Post-Bid
Ephrata, PA 17522

Conestoga Pines Connection
Results
$500,000 to $999,999 est. value
PA

Eden Road and East Roseville Intersection Improvements
Results
$450,000 est. value
Manheim, PA 17601

Golden Triangle Signal Upgrade/Lititz Pike Pedestrian Crossing Signal
Results
$700,000 est. value
Lancaster, PA 17601

Farm Outbuilding Demolition
Demolition
Results
$20,000 est. value
Lancaster, PA 17603

East Main Street Sidewalk Replacement
Results
$92,000 est. value
Lititz, PA 17543

Sidewalk, Curb and Drainage Maintenance on East Main Street (SR 772) and North Water Street (SR 1035) and Watermain Replacement on Water Street Roadway and Reconstruction
Results
Lititz, PA 17543

Last Updated 09/10/2021 08:23 AM
Project Title

City Hall Entrance

Physical Address View project details and contacts
City, State (County) Lancaster, PA 17602   (Lancaster County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Demolition, Exterior Lighting, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed includes the selective demolition of the existing entrance landing, steps and adjacent section of sidewalk and curb. The construction of a new sidewalk, and curb, steps, ramp and landing including welded metal handrail. In addition, the work includes the installation of three flagpoles and flagpole mounted lighting.

Details

Division 02 - Existing Conditions, Demolition.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents