Similar Projects
Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Quaker Falls Bridge Rehabilitation
Results
New Castle, PA 16101

Major Bridge P3
New Construction
Post-Bid

Bridge Repairs
Results

Bridge Demand Mtc 14, 22
New Construction, Infrastructure
Post-Bid
$1,000,000 to $2,499,999 est. value

Bridge Demand Mtc 13, 21
Results
$1,000,000 to $2,499,999 est. value

Bank's Covered Bridge Rehabilitation Project
Results
$550,000 est. value
PA

T - 341 Burkey Road Bridge
Results
$1,000,000 to $2,499,999 est. value
PA

Tower Road Br/Funk Run
Results
$500,000 to $999,999 est. value
PA

Beaver Dam Road
New Construction
Results
$500,000 to $999,999 est. value
PA

2021 Stavich Bike Trail Bridge Rehabilitation Project
Renovation
Results
New Castle, PA 16107

Bridge Repairs
New Construction, Infrastructure
Results

Cottage Grove Road Bridge Replacement Project
New Construction, Infrastructure
Results
New Castle, PA 16105

Last Updated 03/30/2022 02:39 AM
Project Title

Enon Road Over Sugar Creek - Bridge Replacement

Physical Address View project details and contacts
City, State (County) PA   (Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project is as follows: For the bridge structure replacement, asphalt approach, drainage, guide rail, pavement marking, and other miscellaneous construction as indicated on the approved drawings for STATE ROUTE 0551, SECTION L07, in LAWRENCE COUNTY, NORTH BEAVER TOWNSHIP Commonwealth of Pennsylvania. The project being situates as follows: From approximately 600 feet south of Fullerton Road at segment 0100 offset 3101 to the intersection with Fullerton Road at segment 0110 offset 0300. Altitemunit Of Measurequantityunit Priceitem Totalfcpdpmod Descciswccspec Provaction 0203-0001cubic Yard348.000 01nc Class 1 Excavation 0203-0004cubic Yard383.000 01nc1 Class 1b Excavation 0203-0006linear Foot63.000 01ng4 Saw Cutting 0204-0150cubic Yard5.000 01nc1, h, s Class 4 Excavation 0208-0001hour16.000 01nc Special Rolling 0212-0001linear Foot548.000 01nc3, h, m2 Geotextile, Class 1 0212-0014square Yard1,517.000 01nc3, h, m2 Geotextile, Class 4, Type a 0222-0016square Yard153.000 11nc3 Geocell Load Distribution Mat Type a, 8" Depth, Textured Walls/Perforated 0313-0334square Yard1,257.000 01ne Superpave Asphalt Mixture Design, Base Course, Pg 64s-22, < 0.3 Million Esals, 25.0 Mm Mix, 10 " Depth 0350-0108square Yard1,578.000 01nc, e Subbase 8" Depth (No. 2a) 0350-0121ton207.000 01nc, e Subbase (No. 2a) 0413-0194square Yard1,285.000 01nf Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, < 0.3 Million Esals, 9.5 Mm Mix, 1 1/2" Depth, Srl-m 0413-6035square Yard1,271.000 01nf Superpave Asphalt Mixture Design, Binder Course, Pg 64s-22, < 0.3 Million Esals, 19.0 Mm Mix, 2 1/2" Depth 0460-0003square Yard2,556.000 01nf4 Asphalt Tack Coat (Ntt/Cntt) 0461-0001square Yard299.000 01nf4 Asphalt Prime Coat 0608-0001lump Sum1.000 01nx Mobilization 0609-0007lump Sum1.000 94nx Inspector's Field Office And Inspection Facilities, Type b 0609-0009lump Sum1.000 94nxstd Equipment Package 0610-7001linear Foot548.000 01nh2 4" Pavement Base Drain 0610-7400cubic Yard5.000 01nh2 Additional Coarse Aggregate For Extra Depth Pavement Base Drain 0615-0022linear Foot14.000 01nh2 6" Subsurface Drain Outlets 0615-0066each3.000 01nc1, h2, r 66" Red Subsurface Drain Outlet Marker 0619-0459each4.000 01nj1, j3 Permanent Impact Attenuating Device, Type Ii, Test Level 3, Tangent (Mash) 0620-0503linear Foot350.000 01nc1, j Remove Existing Guide Rail (Contractor's Property) 0620-1600linear Foot100.000 01nj Type 31-s Guide Rail 0620-2030each4.000 01nj Thrie-Beam Guide Rail To Pa Type 10m Bridge Barrier Transition Without Curb 0620-2041each4.000 01nj Thrie-Beam Terminal Connector 0686-0060lump Sum1.000 01nx Construction Surveying, Type d, Modified 0689-0005lump Sum1.000 01nx Cpm Schedule, With Updates 0690-0001dollar1,000.000$1.00$1,000.0001yx Internal Facilitation 0703-0022cubic Yard187.000 11nc1, h No. 8 Coarse Aggregate 0802-0001cubic Yard55.000 01nc1, m Topsoil Furnished And Placed 0804-0006pound24.000 01nm3 Seeding And Soil Supplements - Formula l, Including Mulch 0806-0103square Yard111.000 01nm2 Temporary Ultra Short-Term, Rolled Erosion Control Product, Type 1d 0811-0003linear Foot350.000 01nj2, m Temporary Protective Fence 0845-0001dollar1,000.000$1.00$1,000.0001ym2 Unforeseen Water Pollution Control 0855-0003each1.000 01nm2 Pumped Water Filter Bag 0867-0012linear Foot882.000 01nm2 Compost Filter Sock, 12" Diameter 0867-0022linear Foot48.000 01nm2 Compost Filter Sock, 24" Diameter 0901-0001lump Sum1.000 01nq Maintenance And Protection Of Traffic During Construction 0901-0231day30.000 01nq Additional Warning Lights, Type b 0901-0240square Foot150.000 01nq, r Additional Traffic Control Signs 0901-0450each2.000 01nq 3-Line Changeable Message Sign With Telecommunications 0937-0107each8.000 01nj, r Guide Rail Mounted Delineator Type b, (w/w) 0937-0114each8.000 01nj, r Guide Rail Mounted Delineator Type d, (w/w) 4962-1001linear Foot1,600.000 01nyesostd 6" White Waterborne Pavement Markings Modified 4962-1005linear Foot1,600.000 01nyesostd 4" Yellow Waterborne Pavement Markings Modified 1018-0001lump Sum1.000 11nt1r Emoval Of Existing Bridge 1019-0050square Yard97.000 11nk2 Protective Coating For Reinforced Concrete Surfaces (Penetrating Sealers, Bridge Superstructure) e8510-0001lump Sum1.000 11nyess4std Precast Concrete Box Culvert, As Designed, s-40361 a1002-0052pound1,968.000 11ns7 Reinforcement Bars, Epoxy Coated o8520-0001lump Sum1.000 Ns4std Cast-In-Place Reinforced Concrete Box Culvert o8590-0001lump Sum1.000 Nh1std Concrete Culvert 9000-0003dollar25,000.000$1.00$25,000.0001yf, f1proj Maintenance Of Project Detour Route 9000-0020lump Sum1.000 01nxproj Removal Of Abandoned Gas Line 9000-0021lump Sum1.000 01nc1, h, m2proj Stream Control 9000-0022square Foot1,200.000 01nmproj Wetland Crossing Mat 9000-0250dollar1,000.000$1.00$1,000.0001yc1, p8std Locate Exisitng Underground Facilities 9000-2081cubic Yard405.000 01nc1std As Directed Subgrade Undercut 9000-5100lump Sum1.000 01nxstd Electronic Ticketing System

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents