Similar Projects
Re-wiring the Port St Joe High School Welding Shop
Renovation
Design
Port St Joe, FL 32456

Critical Facilities Generators
Renovation
Sub-Bidding
$711,871 CJ est. value
Chattahoochee, FL 32324

Airport Road Signs At Pensacola International Airport
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Pensacola, FL 32504

FEMA Generator Project LS W-15, W-14, E-06, E-03, E-01 and SW-08 Backup Electrical
Alteration
Post-Bid
$1,176,000 est. value
Hollywood, FL

Generator Maintenance and Repair Services
Term Contract
Post-Bid
Lauderhill, FL

Steel Transmission Poles for the Circuit 838 Structures #5, 6, 7, 10, and 11 Replacement
Results
Less than $228,975 est. value
Jacksonville, FL

CMCD Hangar Generator
Alteration
Results
Naples, FL

North County Water Reclamation Facility (NCWRF) Electrical Service #1 Upgrade
Renovation
Sub-Bidding
$4,100,000 CJ est. value
Naples, FL 34109

Contract Services for Electrical Construction - Countywide
Term Contract
Post-Bid
$200,000 CJ est. value
Green Cove Springs, FL 32043

Effluent Pumps Standby Generators and Administration Building - G.T Lohmeyer WWTP
Alteration
Results
Fort Lauderdale, FL 33316

Generators for Critical Facilities
Renovation
Sub-Bidding
$500,000 CJ est. value
Blountstown, FL 32424

Day-Labor Projects Electrical
Alteration
Post-Bid
FL

Bay County Sheriff’s Office Jail Generator Replacement Project
Alteration
Results
$202,685 est. value
Panama City, FL 32404

Repair the Highway Lighting System
Term Contract
Sub-Bidding
$147,500 CJ est. value
Jacksonville, FL 32211

Electrical Work, Roadway Signing
Infrastructure
Post-Bid
$839,431 CJ est. value
Jacksonville, FL 32257

Last Updated 12/20/2023 04:05 PM
Project Title

Electrical Improvements To Lift Station E3, E17, And E21

Physical Address View project details and contacts
City, State (County) Clermont, FL 34711   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $313,205 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this solicitation is to receive responses from qualified electrical contractors to provide electrical improvements to lift stations E3, E17, and E21 in accordance with the terms, conditions, and specifications contained in this solicitation. Lift station E-3 Electrical Rehabilitation Replace non fuse disconnect with a new 300 amp Stainless Steel Non fuse disconnect. Replace the existing 300 amp meter base with a new 300 amp meter base. Replace the existing 300 amp main breaker and enclosure with a new 300 amp main breaker and stainless steel enclosure. Replace 400 amp ONAN transfer switch and enclosure with a new 400 amp ONAN transfer switch and stainless steel enclosure. Replace all wiring from the generator to the transfer switch. Replace all wiring from transfer switch to main electrical distribution panel. Replace 480 VAC surge protection and 30 amp disconnect. Make all electrical connections and torque properly. Install new Myers hub on all penetrations. Replace old unistrut supports with new stainless steel unistrut supports. Use all stainless steel hardware. Pull all necessary permits and arrange for inspections as required. Include signed and sealed drawings, if needed for permitting process. Must provide backup 150 Kw generator while work is performed. Must coordinate with electric company before work is performed. Post applicable permit at job site. Restore gravel at the lift station to before project conditions at minimum. Provide testing and training to City of Clermont personnel. Warranty supplied to the City of Clermont shall be minimum one (1) year parts and labor. Lift station E17 Electrical Rehabilitation Replace non fuse disconnect with new 400 amp Stainless Steel non fuse disconnect. Replace 400 amp meter base with new 400 amp meter base. Replace 400 amp main breaker and enclosure with new 400 amp main breaker and Stainless steel enclosure. Replace 400 amp ONAN transfer switch and enclosure with new 400 amp ONAN transfer switch with stainless steel enclosure. Replace wiring from the generator to the transfer switch. Replace wire from transfer switch to main distribution panel. Replace 480 vac surge protection and 30 amp disconnect devices. Make all electrical connections and torque properly. Install new Myers hub on all penetrations. Replace old unistrut supports with new stainless steel unistrut supports. Use all stainless steel hardware. Pull all permits and arrange for inspections as required. Include signed and sealed drawings if needed for permitting process. Must provide a backup 150 Kw generator while work is being performed. Must coordinate with electric company before work is performed. Post all applicable permits at the job site. Restore gravel to existing condition. Provide testing and training to City of Clermont Personnel. Warranty shall be one (1) year parts and labor. 3.4. Lift Station E21 Electrical Rehabilitation Replace 300 amp main breaker and enclosure with new 300 amp main breaker and stainless steel enclosure. Replace 300 amp ONAN transfer switch and enclosure with new 300 amp ONAN transfer switch and stainless steel enclosure. Replace wiring from generator to transfer switch. Replace wiring from transfer switch to main distribution panel. Replace 480 vac surge protection and 30 amp disconnect devices with new 480 vac surge protection and 30 amp disconnect devices. Make all electrical connections and torque properly. Install new Myers hub on all penetrations. Replace old unistrut supports with new stainless steel unistrut supports. Use all stainless steel hardware. Pull all necessary permits and arrange for inspections as required. Include signed and sealed drawings if needed for permitting process. Must provide backup 150 Kw generator while work is being performed. Must coordinate with electric company before work is performed. Post all applicable permit at job site. Restore gravel to existing condition. Provide testing and training to city of Clermont personnel. Warranty shall be one (1) year parts and labor. Lift Station E21 Electrical Rehabilitation Replace the 300 amp main breaker and enclosure with a new 300 amp main breaker and stainless steel enclosure. Replace the 300 amp ONAN transfer switch and enclosure with a new 300 amp ONAN transfer switch and stainless steel enclosure. Replace wiring from generator to transfer switch. Replace wiring from the transfer switch to the main distribution panel. Replace 480 vac surge protection and 30 amp disconnect devices with new 480 vac surge protection and 30 amp disconnect devices. Make all electrical connections and torque properly. Install new Myers hub on all penetrations. Replace old unistrut supports with new stainless steel unistrut supports. Use all stainless steel hardware. Pull all necessary permits and arrange for inspections as required. Include signed and sealed drawings if needed for the permitting process. Must provide backup 150 Kw generator while work is being performed. Must coordinate with the electric company before work is performed. Post all applicable permits at the job site. Restore gravel to existing condition. Provide testing and training to city of Clermont personnel. Warranty shall be one (1) year parts and labor The successful respondent must provide all labor, materials, equipment, and tools necessary to perform electrical improvements to lift stations E3, E17, and E21. All respondents must hold a valid electrical license, general license, and any other contractor's license, issued by the State of Florida, which may be required to complete the work. A copy of all licenses pertaining to this work must be submitted with the bid response. The successful respondent must have been in the commercial/industrial electrical business for a minimum of five (5) years and provide evidence of such with their bid response. Respondents to this solicitation must provide experienced technicians to perform all labor and provide all materials, tools, equipment, permits, and licensing necessary to perform the work. The successful respondent is solely responsible for the safety of their employees and sub-contractors relative to the work, work procedures, material, equipment, transportation, signage, related activities, and equipment. To ensure that all prospective respondents have accurately and completely understood the requirements of this solicitation, the City of Clermont Procurement Services Department will accept written questions up until 3:00 pm on Tuesday, November 21, 2023. Verbal inquiries will not be accepted and potential respondents are instructed to only seek additional information or clarification or to communicate in writing with the Procurement Services Director. The City of Clermont requires all questions relating to this solicitation to be entered through the "Question and Answer" tab available on the Portal. Responses to questions will be provided online at https://procurement.opengov.com/portal/clermontfl . All Questions Must Be Submitted Prior to the Deadline. Questions Will Not Be Answered via Telephone or Fa The issuance of this solicitation and the acceptance of responses do not constitute an agreement by the City that it will enter into a contract with a respondent for this project. The City reserves the right to extend the response due date, request additional information from any and all respondents, reject any and all responses, cancel the project, and/or re-advertise the solicitation. The City reserves the right to disqualify any respondent at the sole discretion of the City. By submitting a response and subsequent information, the respondents waive the right to object to the exercise of the City's right to disqualify a respondent and/or a response, either now or in the future. A Bid Bond is not applicable to this solicitation Performance & Payment Bonds are not applicable to this solicitation.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents