Similar Projects
Concrete Pavement, General (All Classes)
Infrastructure
Bidding
$5,000,000 CJ est. value
Municipio, NE 68883

Circle Drive Drainage Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Grand Island, NE 68801

Soil Purchasing, Excavating and Hauling
Infrastructure
Post-Bid
Doniphan, NE

Grand Island Public Schools - Senior High Additions & Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Grand Island, NE 68803

Burdick Pumping Station Check Valves
New Construction
Results
$55,000 est. value
Grand Island, NE

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Conestoga Mall Redevelopment
Demolition, New Construction, Infrastructure, Renovation - 200,000 SF
Pending Verification
$200,000,000 CJ est. value
Grand Island, NE 68803

North Road - Westgate Road to Old Potash Highway Roadway Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Grand Island, NE 68803

Gates Elementary School Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$8,500,000 CJ est. value
Grand Island, NE 68803

Curb Ramp Project
Infrastructure
Results
$105,988 CJ est. value
Grand Island, NE 68801

Surface Prep and Painting of Lincoln Park Pool
Infrastructure
Bidding
$400,000 CJ est. value
Grand Island, NE 68801

Saturn Street Lift Station Rehabilitation
Renovation
Post-Bid
$430,000 est. value
Alda, NE 68810

Wastewater Treatment Plant Flow Improvements
Renovation, Infrastructure
Results
$7,796,000 CJ est. value
Grand Island, NE 68801

Join Parachute / Grand Island
New Construction, Infrastructure - 6,389 SF
Post-Bid
$2,000,000 CJ est. value
Grand Island, NE 68803

Water Main Project
Infrastructure
Results
Grand Island, NE

Last Updated 09/22/2022 10:09 AM
Project Title

Lift Station No. 17 Improvements

Physical Address View project details and contacts
City, State (County) Grand Island, NE 68801   (Hall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,621,703 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of gravity sanitary sewer collection system sized; 12-inch diameter pipe, sanitary sewer force main sized 8-inch, precast concrete manholes, earth excavation, groundwater dewatering, construction of one duplex submersible lift stations, installation of prefabricated electrical building, installation of stand-by generator, abandonment of one existing lift station, and ancillary items for a complete operations sanitary sewer system. This work shall consist of constructing curb and gutter, sidewalks, and driveways of Portland cement concrete on an approved, prepared subgrade in strict accordance with these specifications and in conformity with the lines, grades, and applicable drawings. All curb and gutter districts constructed shall conform to Division II, Portland Cement Concrete, as well as these specifications

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents