Similar Projects
Well 15 Replacement/ Replace Vertical Turbine Pump Assembly
Term Contract
Design
Indian Head, MD 20640

Phase 7 Well Construction
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21409

Phase 7 Well Construction (Wells-To-2022)
Alteration
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

H145--Repair Aurora Sump Pump and Motor
Term Contract
Post-Bid
Baltimore, MD 21201

Replace Booster Pump
Alteration
Post-Bid
$25,000 to $100,000 est. value
Beltsville, MD 20705

Boonsboro High Irrigation Well(s)
Results
Boonsboro, MD 21713

Pump, Motor and Mechanical Equipment Maintenance Services
Term Contract
Results
Bel Air, MD 21014

Grinder Pump Replacement Services
Alteration
Bidding
California, MD

Residential Well Drilling At Clagett Farms
Demolition
Post-Bid
Annapolis, MD 21403

Fill In and Cap Hand Dug Wells, Newtowne Neck State Park, St. Mary`S County, MD
Results
Less than $50,000 est. value
Leonardtown, MD 20650

Parole SPS Pump Retrieval Modification
Alteration
Bidding
$500,000 to $1,000,000 est. value
Annapolis, MD

Wet Well and Manhole Rehabilitation
Infrastructure
Post-Bid
Poolesville, MD

Benjamin Banneker Elementary School Well Pump Replacement
Results
Less than $22,000 est. value
Loveville, MD 20656

North Beach Flood Pump/Equipment Project - 5th Street
Alteration
Bidding
$400,000 est. value
North Beach, MD 20714

Whitemarsh Park Irrigation Well
Infrastructure
Post-Bid
Centreville, MD 21617

Last Updated 05/13/2022 03:47 PM
Project Title

ASIS - Rehab Island Water Well #1

Physical Address View project details and contacts
City, State (County) Berlin, MD 21811   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include all construction, labor, supplies, materials, tools, equipment, facilities, and travel necessary to complete the work. Rehab Island Water Well #1.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Water Supply Wells, Irrigation Water Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents