Similar Projects
Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Post-Bid
Bensenville, IL 60106

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Aurora, IL 60502

2021 Cured in Place Pipeline Water Main Rehabilitation
Alteration
Post-Bid
Naperville, IL

Water Main Lining
Results
$496,793 est. value
Glendale Heights, IL

Last Updated 10/12/2022 12:07 AM
Project Title

Lift Station #5 and Force Main Replacement Project

Physical Address View project details and contacts
City, State (County) West Chicago, IL 60185   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,532,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the inclusion of a lift station as well as the replacement of a force main and related work Completion- 150 calendar days All bid proposals are to be made on the forms provided and will be made a part of the contract documents to be executed with the City. Bid proposals are to be received in a sealed 9"x12" or 10"x13' envelope. The envelope shall be marked: "Sealed Bid - LIFT STATION #5 & FORCE MAIN REPLACEMENT PROJECT", and the name of the bidder. No bidder may withdraw his/her bid after the scheduled closing time for a period of ninety (90) days. Minorities and Women Owned Businesses are encouraged to submit bids on these services. The City of West Chicago requires all construction Contractors bidding on Public Works projects and all of their sub-contractors to be governed by the Illinois Prevailing Wage Act. The City reserves the right to reject any and all bid proposals, to waive any informality in any bid proposal, to readvertise the proposed services, and to accept the proposal most advantageous to the City. For any bidding questions, please contact Archana Kuchimanchi at RJN Engineering; Phone (630) 682-4700 x1344 or via email at archana.kuchimanchi@rjnmail.com.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents