Similar Projects
Forest Hill Avenue Water Main Replacement
Infrastructure
Bidding
$348,336 est. value
East Cleveland, OH 44112

Florida, Westmoreland, Williamson Water Main Replacement
Infrastructure
Bidding
Cincinnati, OH

State Routes 7 and 148 Water Main Replacements
Post-Bid
Less than $125,000 est. value
Powhatan Point, OH 43942

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Mink Pressure District Water Main Improvements
Results
Less than $3,410,000 est. value
New Albany, OH 43054

Mink Pressure District Water Main Improvements and Harrison Road Storm Sewer Improvements
Results
Less than $3,450,000 est. value
New Albany, OH 43054

2nd Street Waterline Replacement
Infrastructure
Bidding
Byesville, OH 43723

Water Controls
Post-Bid
Less than $112,040 est. value
Hamden, OH

Crown and Victory Water Main Replacement
Results
Less than $545,575 est. value
Montgomery, OH

Navarre Avenue Water Valve Improvements
Infrastructure
Bidding
$104,000 est. value
Oregon, OH 43618

Water Meters 2021
Term Contract
Post-Bid
Lorain, OH

Vitrified Clay and PVC Pipe
Results
Cleveland, OH 44114

Huffman Area Water Main Improvements
Infrastructure
Bidding
Dayton, OH

2021 Contract Services for Repair Work of Water and Sewer Lines
Post-Bid
Warren, OH 44481

Construction of the Water System Repair/Replacement Project
Results
Less than $1,850,000 est. value
Glendale, OH 45246

Last Updated 09/22/2021 08:52 AM
Project Title

Water Main Extensions to Imlay Road and Wilsonwood Road

Physical Address View project details and contacts
City, State (County) Blue Rock, OH 43720   (Muskingum County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consisting of construction of approximately 8,860 linear feet of 4- and 3-inch PVC water main, with 8,740 linear feet of 4- and 3-inch water main installed by open trench methods and 120 linear feet of 3-inch water main installed by HDD methods, 3 flushout assemblies, 3 gate valves, 9 customer service connections and a tie-in to the existing water distribution system and other appurtenances necessary to complete the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents