Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Saint Charles Mission School Parking Lot Reconstruction and Drain Field Replacement
Infrastructure
Design
$570,000 CJ est. value
Billings, MT 59101

Saint Charles Mission School Parking Lot Reconstruction and Drain Field Replacement
Infrastructure
Design
$570,000 CJ est. value
Billings, MT 59101

Contract 1 City Overlay
Infrastructure
Bidding
$200,000 CJ est. value
Billings, MT 59101

Contract 2 City Chip Seal
Infrastructure
Bidding
$700,000 CJ est. value
Billings, MT 59101

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

Water System Improvements
Infrastructure
Results
Billings, MT 59105

Alkali Creek Water and Sewer Extension
Infrastructure
Results
Billings, MT

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Riverfront Park Trail - City of Billings
Infrastructure
Conception
$1,350,000 CJ est. value
Billings, MT 59101

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

West Taxilane Extension
Infrastructure
Post-Bid
$100,000 CJ est. value
Billings, MT 59105

Underpass Ave - Billings
Infrastructure
Results
$9,975,733 CJ est. value
Billings, MT 59101

Last Updated 12/08/2022 02:33 AM
Project Title

Water Main Extension - Grey Eagle Ditch to Arlington Avenue

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: On South Frontage Road, approximately 3/4 mile east of S Billings Blvd. Project Category Code: Water Utilities, Removal and Replacement of pipe, Waterlines Description: The project consists of: the installation of approximately 390-ft of 12-inch water main and water line appurtenances completing the loop from just east of the Grey Eagle Ditch to Arlington Avenue within the borrow ditch south of South Frontage Road, including miscellaneous removal and restoration items associated with the work. Additional Description: Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the "City of Billings, MT" in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail or hand delivered shall have any of the bid securities included.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents