Similar Projects
3rd St Mixed Use
New Construction
Conception
Puyallup, WA 98371

Key Tower Apartment Conversion
New Construction, Renovation
Conception
$4,000,000 est. value
Tacoma, WA 98402

LIHI Mixed- Use Development
New Construction - 127,976 SF
Design
Tacoma, WA 98418

Asia Pacific Cultural Center Expansion
Addition, Infrastructure - 10,100 SF
Design
$10,000,000 est. value
Tacoma, WA 98409

ASOG Complex Camp Murray
New Construction, Infrastructure - 56,000 SF
Bidding
$25,000,000 CJ est. value
Fort Lewis, WA 98433

Chipotle #46-4140
Renovation - 3,808 SF
Post-Bid
Gig Harbor, WA 98335

Visionworks
Renovation - 3,213 SF
Post-Bid
$251,000 est. value
Tacoma, WA 98409

American Lake (VAAL) Phase 2A Site Development
Term Contract, Alteration
Results
$10,000,000 to $25,000,000 est. value
Lakewood, WA

Upper Intake Retaining Wall Construction
Infrastructure
Results
$39,500 CJ est. value
Tacoma, WA 98405

Chuck E Cheese #626
Renovation - 18,355 SF
Construction
Tacoma, WA 98409

Point Defiance Zoo and Aquarium South Pacific Aquarium Tank and Exhibit Improvements
Renovation, Infrastructure
Construction
$3,736,964 CJ est. value
Tacoma, WA 98407

Frederickson Self Storage
New Construction, Infrastructure - 95,000 SF
Pending Verification
$10,300,000 CJ est. value
Tacoma, WA 98446

Burnham Drive Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Gig Harbor, WA 98332

I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,001,000 CJ est. value
Tacoma, WA 98409

Kohl`s Tacoma Mall
New Construction - 40,000 SF
Design
$3,400,000 est. value
Tacoma, WA 98409

Last Updated 08/14/2023 08:05 AM
Project Title

Mount Rainier Resort - Phase I

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98401   (Pierce County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Convention/Exhibit Center, Food/Beverage Service, Golf Course, Hotel/Motel, Park/Playground, Retail, Roadway Lighting, Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $230,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the phased construction of a master-planned resort. The 420-acre resort would bring a 270-room hotel with restaurants, two indoor and four outdoor tennis courts, a heated swimming pool, spa and fitness center. Plans also call for a 22,000-square-foot conference center, an 18-hole golf course, a sewer plant to accommodate the new development and 325 housing units. Additionally, there's a 20,000- to 30,000-square-foot shopping center planned for retail and tourist shops. As of August 14, 2023, the project is currently on hold. The owner will serve as the general contractor for the first phase of the project which consists of preliminary wetland mitigation, including grading work required for the construction of the wetlands, installation of water and sewer system lines and any site work required for installation of sewer treatment facilities. There will be no bidding opportunities for this phase of the project.*

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles, Flags and Banners.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Laboratory Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Water Drains, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents