Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

The Peninsula Wellness Community
New Construction, Infrastructure - 100,000 SF
Design
$216,000,000 CJ est. value
Burlingame, CA 94010

Quick Build Pedestrian Improvements Project
Infrastructure
Post-Bid
$73,500 est. value
Millbrae, CA 94030

RFP Engineering - Redwood Shores Isolation Valve Installation Project
Infrastructure
Post-Bid
$175,000 CJ est. value
Redwood City, CA 94063

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Middle Avenue and Nealon Park Pedestrian Improvements Project
Infrastructure
Results
Menlo Park, CA

Southline Office and Lab Development
New Construction, Infrastructure - 2,659,000 SF
Construction
$426,000,000 CJ est. value
South San Francisco, CA 94080

Southline Office and Lab Development
New Construction, Infrastructure - 2,659,000 SF
Construction
$426,000,000 CJ est. value
South San Francisco, CA 94080

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

Bell Lofts
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
San Bruno, CA 94066

East Hillsdale and Foster City Boulevards Median Refurbishment - PK-03 - City of Foster City
Alteration
Conception
$500,000 est. value
Foster City, CA 94404

Holiday Inn Express and Suites / Redwood City
Demolition, New Construction, Infrastructure - 52,011 SF
Design
$24,200,000 CJ est. value
Redwood City, CA 94063

Citywide Street Rehabilitation Package 2-B
Infrastructure
Post-Bid
$1,150,000 est. value
San Mateo, CA

Last Updated 03/20/2023 12:08 AM
Project Title

Chrysler Stormwater Pump Station Improvements Project

Physical Address View project details and contacts
City, State (County) Menlo Park, CA 94025   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $10,585,355 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 20, 2023 , this project has not yet been awarded. The project is expected to be awarded on February 28, 2023.** d Valid Liquidated Damages Estimated Bid Value Start/Delivery Date Project Duration 450 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/21/2022 2:00 PM (PST) The work to be done consists of furnishing and installing all materials, equipment, transportation and labor to construct a new stormwater pumping facility including underground wet well, pump and motor room, electrical control room, engine-generator room, pumping equipment, electrical equipment and controls, automatic standby diesel engine-generator with integral fuel tank, appurtenant storm drain improvements, water and fire protection services, driveway and pavement, finish grading, miscellaneous concrete, landscaping, and other incidentals as necessary to complete the work shown on the Project Plans and Drawings, Standard Specifications, Special Provisions, and Technical Specifications. Other Details Notes Engineer's Estimate $10 million

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents