Last Updated 06/07/2021 04:44 PM
Project Title

Goose Pasture Tarn Dam Rehabilitation

Physical Address View project details and contacts
City, State (County) Breckenridge, CO 80424   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of an overtopping reinforced-concrete service spillway and adjacent overtopping roller-compacted concrete emergency spillway. Replacement of the demolished spillways with a single overtopping reinforced concrete spillway. Construction of a reinforced concrete cutoff wall beneath the new spillway crest that extends to the left and right of the new spillway. Construction to replace the existing low-level outlet works intake, gate, stem wall and control house, and lining the 30-inch-diameter, RCP low-level outlet conduit with a cured-in-place pipe (CIPP) liner. Replacement of a section of the existing water treatment plant (WTP) intake pipe with a new intake, fish screen, concrete-encased steel WTP pipe, WTP pipe vault, knife gate, and ductile iron pipe (D.I.P) section. Construction of a temporary 96-inch-diameter left bypass pipe for reservoir diversion, including an intake with a temporary trash rack, and a concrete-encased section that will remain following construction. Raising the dam crest by 2.6 feet to increase the discharge capacity of the new spillway. Construction of a drainage system that includes a subdrain system beneath the new spillway, a chimney/toe drain system beneath the downstream slope of the dam, and a relief drain system below the downstream slope near the right abutment. Earthwork including excavations for the planned structures and drainage system, and placement and compaction of zoned embankment dam materials.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents