Similar Projects
Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Hunter Creek Bridge
Infrastructure
Conception
$2,455,114 CJ est. value
Jim Thorpe, PA 18229

Jim Thorpe Retaining Wall
Infrastructure
Design
$3,144,640 est. value
Lehighton, PA 18235

Jim Thorpe Retaining Wall
Infrastructure
Design
$3,144,640 est. value
Lehighton, PA 18235

Construction of Tolling Facility Between Milepost A-87.10 and Milepost A-123.51
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Jim Thorpe, PA 18229

Construction of Tolling Facility Between Milepost A-87.10 and Milepost A-123.51
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Jim Thorpe, PA 18229

2021 Bituminous Paving
Post-Bid
Lehighton, PA

Lower Baers Road Project State Game Lands #217
Infrastructure
Post-Bid
PA

Milling and Paving Project
Results
$451,716 est. value
Weatherly, PA 18255

SE Blue Mountain Road Access SGL 217
Results
PA

Sr 1003 - Brady Twp Line To Sr 1001
Alteration
Design
$2,899,132 est. value

2022 Road Paving
Infrastructure
Bidding
$400,000 CJ est. value
Albrightsvlle, PA 18210

2021 Bituminous Paving Project
Infrastructure
Post-Bid
Weatherly, PA 18255

3rd Street, South Street And North 1st Street Distribution Main Replacement
Results
Lehighton, PA 18235

2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Last Updated 08/03/2022 12:58 AM
Project Title

Weatherly Multi-Use Trail Phase 1 Installation / Construction

Physical Address View project details and contacts
City, State (County) Weatherly, PA 18255   (Carbon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of the following: The Weatherly Multi-Use Trail Phase I project in Weatherly Borough is a 0.66 mile linear trail project in a corridor owned by the Borough of Weatherly. The multi-use trail will be a 10 foot wide trail with 2 foot graded shoulders. The project will, for the most part, use the existing drainage infrastructure and rehabilitate the existing ditches associated with the trail corridor. Some new drainage pipes are proposed. Drainage areas, flow patterns, volumes and drainage structures / location of drainage structures are proposed to remain unchanged by the trail implementation. The ground disturbance associated with this Multi-Use Trail project will primarily be: 1) the excavation of the trail corridor; 2) removal of soil and debris in the trail drainage pipes and ditches to re-establish functionality; and 3) construction of two pedestrian bridges. Suitable excavated material / soil will be reused within the trail corridor as fill and base material. All unsuitable material / soil will be properly disposed of off-site. Required signage and access control features (gates, boulders, fencing) are also to be installed. CLARIFICATION DEADLINE 7/22/2022 3:30 PM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents