Similar Projects
Roadway Improvement Project for Case Boulevard (U.S. Route 202 Ramp to River Road)
Infrastructure
Bidding
Flemington, NJ 08822

Culvert Repairs Milepost 112 To 113
Infrastructure
Bidding

Hilltop Drive and Moore Street Road Improvements
Post-Bid
Stockton, NJ 08559

Stanton Mountain Road Improvements Phase 2
Post-Bid
Lebanon, NJ 08833

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Hunterdon County Routes 513 and 628
Results
$6,164,924 est. value
Flemington, Franklin, Glen Gardner, Lebanon, NJ 08822

Runway 4-22 Rehabilitation Project
Term Contract
Construction
$1,800,000 est. value
Whitehouse Station, NJ 08889

T0278 - Concrete Curb, Sidewalk and Gutter Construction - NJDOT
Infrastructure
Bidding

Improvements to Sanford Road
Post-Bid
Sergeantsville, NJ 08557

Loop Road Paving at Hunterdon Central Regional High School
Results
$493,400 est. value
Flemington, NJ 08822

Improvements to Walnut Street and Filbert Street Year 47 CDBG
Infrastructure
Bidding

Main Street Improvement Project Sections I,II,III
Post-Bid
Hampton, NJ 08827

Maintenance Job Order Contracting (JOC) Infrastructure Repairs, Central - 2020
Results
$5,000,001 to $10,000,000 est. value

2018-2019 NJDOT Municipal AID Funded Grant - George Street Improvements
Post-Bid
Lambertville, NJ 08530

Route 78, Rockfall Mitigation
Results
$20,000,001 to $50,000,000 est. value
NJ

Last Updated 09/27/2021 01:17 PM
Project Title

Clark Road Improvement Project

Physical Address View project details and contacts
City, State (County) Lebanon, NJ 08833   (Hunterdon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the construction of ADA accessible curb ramps, resetting of inlet castings, hot mix asphalt base reconstruction and milling and resurfacing of Clark Road from Route 22 to Main Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents