Similar Projects
Contractor - HVAC Repairs
Alteration
Design
$250,000 to $500,000 est. value
Westhampton Beach, NY 11978

Renovations of the Vanderbilt Mansion Boiler Room (C0180)
Renovation
Sub-Bidding
$335,000 CJ est. value
Centerport, NY 11721

QVH HVAC Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Riverhead, NY 11901

Air Filters
Term Contract
Post-Bid
NY

Window Air Conditioning Units
Term Contract
Post-Bid
Lake Ronkonkoma, NY

Cooling Tower Maintenance and Water Treatment
Term Contract
Results
Stony Brook, NY

On-Call Landfill Administration Buildings HVAC System Maintenance
Term Contract
Results
Yaphank, NY 11980

HVAC Units
Term Contract
Post-Bid
Patchogue, NY

Unit Ventilator Replacement
Alteration
Results
North Babylon, NY 11703

225kW Induction Cogeneration System - Yaphank Jail New Section
Alteration
Post-Bid
Yaphank, NY 11980

Replacement of Air-Handlers
Alteration
Results
Smithtown, NY 11787

75 Kw Induction Cogeneration System - Riverhead Jail
Alteration
Post-Bid
Riverhead, NY 11901

James E. Allen Alternative School Roof Top Unit and Unit Ventilator Replacement
Alteration
Results
Wheatley Heights, NY 11798

Ventilation Upgrades at Woodhull School
Alteration
Post-Bid
$1,250,000 est. value
Ocean Beach, NY 11770

Training Building New 3-Bay Substation Contract H - HVAC Construction Work
New Construction, Infrastructure
Results
$484,400 CJ est. value
Central Islip, NY 11722

Last Updated 08/15/2023 05:24 PM
Project Title

Molecular Lab HVAC FCU Upgrades

Physical Address View project details and contacts
City, State (County) Stony Brook, NY 11794   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $401,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of Aug 14, 2023 the project has not yet been awarded. A timeline for award has not yet been established . Stony Brook University Hospital intends to make an award for the above noted commodity, product and/or service. A sealed bid will be held. If you are interested in providing a proposal for the above commodity/product and/or service, you must contact the appropriately designated Campus contact in this advertisement within 15 business days of this Advertisement Notice. The main features of the work to be done under the Contract, in accordance with the Contract Documents shall include, but not be limited to the following: The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of Project Number 23915, titled SBUH Molecular Lab HVAC FCU Upgrade and carry out all of the duties and obligations imposed upon the Contractor by the Contract Documents. The main Mechanical features of the work shall include, but not be limited to the following: Contract Mobilization Survey Submittals Procurement and installation of a new variable refrigerant flow (VRF) HVAC system. Remove and turn over to SBUH the existing fan coil system located in the Residents On-Call Lounge (L2-619) and all associated items. Comply with ICRA/ILSM as required by SBUH Policies and Procedures. Provide all roof and wall opening, fire stopping and roof patching and flashing for mechanical and electrical work. Provide supports for HVAC condenser units, piping and conduit roof supports; and roof patching and flashing. Remove and properly dispose of ductwork and all associated items. Provide refrigerant piping, condensate piping, condensate pump, supports and associated items. Provide electrical wiring, conduits and associated items for the final power connection to the equipment. Provide control systems, communication wiring, conduits, pull boxes, and supports and associated items. Provide factory inspection, startup and training for the new HVAC system. System test Project Closeout Minority Owned Sub-Contracting Goal: 18% Women Owned Sub-Contracting Goal: 12% Service-Disabled Veteran-Owned Business Contracting Goal: 6%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents