Similar Projects
US 12/Snake River Vaughn Hubbard Bridge EB - Bridge Painting
Infrastructure
Conception
$10,004,000 CJ est. value
Pasco, WA 99301

I-182/Over Railroad Bridge EB - Bridge Painting
Infrastructure
Conception
$1,733,000 CJ est. value
Pasco, WA 99301

US 12/Snake River Vaughn Hubbard Bridge EB - Repair Floor Beams
Infrastructure
Design
$1,016,000 CJ est. value
Pasco, WA 99301

I-182/Col R Lee-Volpentest Columbia River Bridge EB - Joint Repair
Infrastructure, Renovation
Design
$1,930,000 CJ est. value
Pasco, WA 99301

Basin City Water-Sewer District Water Service Meter Installation and Water Distribution System BCE Consolidation Project Rebid
Infrastructure
Bidding
$600,000 CJ est. value
Basin City, WA 99343

Argent Road Widening Phase 3
Infrastructure
Bidding
$4,100,000 CJ est. value
Pasco, WA 99301

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Irrigation Well Rehabilitation and Repair
Infrastructure
Results
$517,629 CJ est. value
Pasco, WA 99301

Ambulance Garage Facility
New Construction, Infrastructure - 5,600 SF
Results
$1,369,000 CJ est. value
Connell, WA 99326

Darigold Plant
New Construction, Infrastructure - 400,000 SF
Construction
$600,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

Amazon
New Construction, Infrastructure
Pending Verification
$82,071,000 CJ est. value
Pasco, WA 99301

I-182/Yakima River RC Bremmer Bridges - Joint Repair
Infrastructure, Renovation
Design
$2,689,000 CJ est. value
Pasco, WA 99301

East UGA Expansion Sewer LID: Phase 4
Infrastructure
Bidding
$8,250,000 CJ est. value
Pasco, WA 99301

Last Updated 03/29/2023 10:11 AM
Project Title

Wastewater Treatment Plant (WWTP) Improvements Phase 2A

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $13,996,917 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Pasco, Washington is inviting and requesting bid proposals for construction of the above-named project. This project consists of improvements and modifications to the City's existing municipal wastewater treatment plant (WWTP) which includes furnishing all labor, materials and equipment necessary for the construction of a Solids Handling Building with thickening and dewatering equipment, centrate pump station, intermediate clarifier upgrade (Centrate Storage Tank), waste activated sludge (WAS) pump system improvements, ultraviolet (UV) disinfection improvements, associated electrical and control systems, site work, yard piping, and other appurtenances as necessary to complete the Project. This contract provides the Contractor with five hundred sixty (560) working days to attain project completion. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. Technical questions regarding the scope of this project should be put in writing and directed to Mark Cummings, email mark.cummings@consoreng.com. The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. Work performed on the project will be subject to the higher of prevailing state or federal Davis-Bacon wage rates. The Contractor shall be licensed in the State of Washington. The Contractor shall not discriminate on the basis of race, color, national origin or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded under EPA financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach of this Contract which may result in the termination of this Contract. If a contract exceeds $10,000, the Contractor shall comply with Executive Order 11246, "Equal Employment Opportunity," as amended by Executive Order 11375, "Amending Executive Order 11246 Relating to Equal Employment Opportunity," and as supplemented by regulation at 41 CFR Part 60. Contractor's compliance with Executive Order 11246 shall be based on implementation of the Equal Opportunity Clause, and specific affirmative active obligations required by the Standard Federal Equal Employment Opportunity Construction Contract Specifications, as set forth in 41 CFR Part 60-4. The City of Pasco is an Equal Opportunity and Affirmative Action Employer. The City of Pasco in accordance with Section 504 of the Rehabilitation Act and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by e-mailing Dustin Wittman at wittmand@pasco-wa.gov or calling (509) 545-3447. The City of Pasco reserves the right to reject any or all bids and to waive irregularities in the bid or the bidding. No bidder may withdraw their bid proposal after the hours set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding sixty (60) calendar days. Estimate cost $18,500,000 - $20,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents