Similar Projects
ADA Adaptations | Hyder-Burks Arena
Renovation
Design
$400,000 CJ est. value
Cookeville, TN 38501

Big Mac Drive Roadway Extension
Infrastructure
Bidding
$410,000 CJ est. value
Algood, TN 38506

Big Mac Drive Roadway Extension
Infrastructure
Bidding
$410,000 CJ est. value
Algood, TN 38506

Concrete Mix, Metal Pipe, Plastic Pipe, Recapping Tire Service, Striping/Pavement Marking, Rock, Paving, Asphalt Mix and Milling
Term Contract
Post-Bid
Cookeville, TN

Paving of Three Solid Waste Convenience Centers
Infrastructure
Post-Bid
Cookeville, TN

Addition of A Second Lane
Results
Cookeville, TN 38501

Hot Mix In Place
Results
Cookeville, TN

Lone Oak Townhomes
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Cookeville, TN 38501

Ridgedale Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cookeville, TN 38501

Construction of New Water Lines on Goff Ridge Road Contract I
Infrastructure
Bidding
$601,000 CJ est. value
Baxter, TN 38544

Underground Directional Boring
Infrastructure
Post-Bid
Cookeville, TN

Street Paving
Alteration
Results
Algood, TN

Timberwalk Subdivision
New Construction, Infrastructure
Pending Verification
$124,000,000 CJ est. value
Cookeville, TN 38506

Rock, Hot Mix Asphalt and Cold Mix
Term Contract, Infrastructure
Post-Bid
Cookeville, TN

Resurfacing on S.R. 290 from Shipley Road (L.M. 1.57) to S.R. 135 (L.M. 6.39)
Infrastructure
Results
TN

Last Updated 11/01/2022 03:05 PM
Project Title

TTU New Tucker Stadium West

Physical Address View project details and contacts
City, State (County) Cookeville, TN 38501   (Putnam County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Schematic Drawings, Request for Qualifications, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $25,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 1, 2022, an architect has been selected, and this project is in the programming stage. A bid schedule has not been determined. Although a firm timeline cannot currently be established, construction is not expected to commence prior to first quarter 2024. Any questions should be directed to jwebb@tntech.edu Interested parties must direct all communications regarding this RFQ to the following RFQ Coordinator, who is TTU's official point of contact. Email is the preferred form of communication. Ms. Jody Webb, RFQ Coordinator Capital Projects and Planning Tennessee Tech University Facilities Office Building, Room 116 Mailing address: P.O. Box 5011 Cookeville TN 38505 Street Address: 220 W. Tenth Street Cookeville TN 38501 931-372-3524 jwebb@tntech.edu Tennessee Tech University, on behalf of the State of Tennessee, has issued this RFQ to obtain a Designer interested in providing full design services for the programming, design, contract documents, and construction administration of the New Tucker Stadium West project. TTU intends to enter into an agreement with a Designer that will deliver design services enabling construction of a facility having the highest possible quality within the available funding and the required schedule. Qualifications Statements in response to this RFQ shall be submitted in accordance with the requirements provided herein. Written Question Deadline 4:30 p.m. April 18, 2022 TTU Responds to Written Questions April 22, 2022 TTU Evaluation Complete June 15, 2022 Finalists for Interview Notified June 16, 2022 Information Available for State Architect July 15, 2022 Executive Subcommittee of the State Building Commission July 25, 2022 The method of contractor selection has not been determined at this time.

Details

87,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents