Last Updated | 05/10/2023 05:31 PM |
Project Title | Shore Power Installation at Ncmt Berth 24-10 and 11 |
Physical Address | View project details and contacts |
City, State (County) | National City, CA 91950 (San Diego County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $7,182,700 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions or comments regarding this specification must be submitted electronically to our eBid system where the specification was downloaded and must be received by the Port no later than March 10, 2023, at 1:00 p.m. The work shall include but not limited to demolition, excavation, backfilling, and debris removal. The work will also include the furnishing of all labor and procuring of all materials for installation of the substation, shore power vault, shore power outlet, duct-banks, manholes, primary power service entrance, metering equipment, high voltage substation transformers, grounding, underground electrical cables, wires, concrete pads, distribution switchgear, power vaults, power outlets, underground conduit, conductors, providing connections to the system, related structural work, and other ancillary items to provide a complete and operational system. Provide all labor necessary to complete testing, start-up, and initial preventative maintenance to comply with testing procedures. The bidder must possess a valid California State Contractors License Classification A, General Engineering Contractor and/or C-10, Electrical Contractor, in accordance with the provision of Division 3 Chapter 9 of the Business and Professions Code of the State of California at the time the contract is submitted. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages 2,500 Start/Delivery Date April 2023 Project Duration 520 Calendar Days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |