Similar Projects
New Fire Station
New Construction
Conception
Woodburn, KY

Transpark Station and Northside Station 5/Public Safety Training Center - City of Bowling Green
Renovation
Conception
Less than $12,725,000 est. value
Bowling Green, KY 42128

Jeffersontown Police Headquarters
New Construction - 25,000 SF
Design
Jeffersontown, KY 40299

New Fire Station No. 1
New Construction - 15,500 SF
Design
Frankfort, KY

Merrill-Brown Repair AMLRP
Infrastructure
Bidding
$200,000 est. value
East Point, KY 41216

Clay County High School Area Technology Center Phase 1 - Mass Earthwork
Alteration
Bidding
$1,200,000 est. value
Manchester, KY 40962

Station 1 Bathroom Remodel
Renovation
Post-Bid
Louisville, KY 40291

Site Improvements
Post-Bid
Berea, KY

Station 5 Renovations
Renovation
Results
Louisville, KY 40216

Garrard County EMS
Results
$3,200,000 est. value
KY

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Hendron Fire New Station
New Construction
Construction
$1,200,000 est. value
Hendron, Paducah, KY 42003

Chestnut Street New Police Headquarters
New Construction
Conception
$40,000,000 est. value
Louisville, KY 40203

Jeffersontown Fire and EMS - Fire Station 4
New Construction - 17,500 SF
Bidding
$7,000,000 est. value
Jeffersontown, KY 40299

St. Claire Medical Center Firestopper Repair
Renovation - 82,000 SF
Post-Bid
Morehead, KY 40351

Last Updated 07/19/2022 12:22 AM
Project Title

National Responders Preparedness Center (NRPC) Expansion

Physical Address View project details and contacts
City, State (County) Greenville, KY 42345   (Muhlenberg County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,115,705 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of, but not limited to, the following site clearing and new construction work of a classroom building: 1. Site clearing including, but not limited to, existing concrete driver training pad and other Work indicated in the Contract Documents. 2. Site improvement. 3. Construction of the new KCTCS NRPC Classroom training facility. Re-bid Scope Revisions: 4. Removal of Fire Fighting Simulator, Burn Tower, and adjacent site work. 5. Revision of building foundation system. The mat foundation has been removed from the project, and the building now utilizes a conventional foundation system supported on a reinforced or improved site, see new specification 31 6620 Site Improvement Systems. 6. Reduction of Fire Suppression scope to only include the Mock-Dorm, R-1 occupancy. This allowed for the removal of the Generator and Fire Pump. This revision also predicated some new fire rated walls in the classroom portion of the project. 7. Relocation of water meter connection, and relocation of the main water entrance into the facility. 8. Identification of three additive alternates for the project.

Details

Fire/Police Station, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents