Similar Projects
Penley Avenue Bridge Deck Replacement
New Construction, Infrastructure
Bidding
West Paris, ME 04289

Rockland Branch Rail Bridges Rehabilitation Project
New Construction, Infrastructure
Bidding
Bath, Newcastle, Rockland, Waldoboro, Wiscasset, ME

Railroad Bridge Capacity
Post-Bid
Frenchville, ME 04745

Blue Hill, Falls Bridge No 5038 /Located On Route 175 Over Salt Pond Outlet
Post-Bid
Blue Hill, ME

Replace Stacyville Road Bridge
Results
$25,000 to $100,000 est. value
Patten, ME 04765

Veranda Street Bridge Replacement, CNRR Crossing Bridge Rehabilitation, and Interstate 295 Southbound Over Washington Avenue Bridge Rehabilitation
Results
Portland, ME 04101

Bridge Repairs - Various Locations and EVR Litchfield Road
Renovation, Infrastructure
Bidding
$3,369,000 est. value
Kittery, Wells, ME

Madawaska Bridge Construction Support Services
Post-Bid
ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Results
$500,000,000 est. value
Kittery, ME

Bridge Improvements to the Augusta, Western Avenue Bridge Over Interstate 95
New Construction
Post-Bid
Augusta, ME

Madawaska Land Port of Entry Design Build Bridge
Results
Madawaska, ME

Installation of a Pedestrian Bridge
Post-Bid
Saco, ME

Taylor Brook Bridge Replacement
Results
Less than $2,125,000 est. value
Auburn, ME 04210

Mattawamkeag Bridge Replacement
Results
Less than $9,779,000 est. value
Mattawamkeag, ME 04451

Detective Benjamin Campbell Bridge Replacement
Results
Less than $8,130,000 est. value
ME

Reported 01/22/2022 12:00 AM
Project Title

Waterville and Winslow, Ticonic Bridge - Region 2

Physical Address View project details and contacts
City, State (County) Waterville, ME 04901   (Kennebec County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

MaineDOT has completed a preliminary d esign report for the Ticonic Bridge #2854 in the Municipalities of Waterville and Wins low and is advancing the project thr ough final design. The Department will develop and finalize the project design w ith consideration given to the feedback and recommendations that result from a contractor interface process. The Department will advance the design to the PS&E stage for advertising in 2022.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents