Similar Projects
Elevated Water Storage Tank
New Construction, Infrastructure
Bidding
$750,000 CJ est. value
Franklin, WI 53132

Village Forest Park Phase 3
Infrastructure
Bidding
$500,000 CJ est. value
Baraboo, WI 53913

Pressure Reducing Valve Repairs
Infrastructure
Sub-Bidding
$460,000 CJ est. value
Bayfield, WI 54814

On-Call Plumbing Services for Headquarters, Central Laboratory, and 13th Street Facilities
Term Contract
Sub-Bidding
Milwaukee, WI 53202

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Detention Center Plumbing Fixtures Replacement
Alteration
Post-Bid
Kenosha, WI 53144

Vehicle Wash Bay & Maintenance Bay Plumbing & Pavement
Results
Appleton, WI 54911

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Reservoir No. 5
Infrastructure
Bidding
$200,000 CJ est. value
Holland, WI 54636

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Rotary Valve #6-2, #6-3, #7-1, #7-2 & #7-3 Replacements
Results
Milwaukee, WI 53207

Wastewater Treatment Plant (WWTP) Facility Improvements
Renovation
Bidding
$400,000 CJ est. value
Edgar, WI 54426

Northwest Region Locations - Bid Package 3 - District Wide Bottle Filler Stations
Alteration
Post-Bid
Milwaukee, WI 53225

Last Updated 11/28/2022 01:07 PM
Project Title

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall

Physical Address View project details and contacts
City, State (County) Madison, WI 53706   (Dane County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,290,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors In general the work consists of LATHROP HALL: Repair of stone masonry, installation of storm windows, wood window repairs, sealant and glazing compound replacement, cleaning, preparing and painting metal cornices, downspouts, railings and steel lintels. VAN VLECK HALL: Existing sealant joints on an 8 story tower will be replaced. Work includes joints between the precast panels and between precast panels and aluminum window and door frames. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents