Similar Projects
Maple Street Industrial Addition
Addition, Demolition, Renovation, Infrastructure - 58,600 SF
Conception
$5,000,000 CJ est. value
Bellingham, MA 02019

Boylston Street Townhouse Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Brookline, MA 02445

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Bennett Lane Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Quincy, MA 02169

MBTA Quincy Bus Maintenance Facility - GC
New Construction, Infrastructure - 300,000 SF
Bidding
$280,000,000 CJ est. value
Quincy, MA 02169

Cassidy Field Parking Lot Improvements
Infrastructure
Bidding
$448,000 CJ est. value
Medway, MA 02053

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

Excavation for Identification of Water Services
Post-Bid
$1,230,142 est. value
Boston, MA

Construction of Site Improvements at the Capen Reynolds
Infrastructure
Results
$375,000 est. value
Stoughton, MA 02072

CCTV and Sewer Pipeline Rehabilitation
Infrastructure
Results
$407,530 CJ est. value
Franklin, MA 02038

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Massapoag Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
S Weymouth, MA 02190

Factory Square Redevelopment
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Franklin, MA 02038

The Learning Experience / Franklin
New Construction, Infrastructure - 5,250 SF
Conception
$2,000,000 CJ est. value
Franklin, MA 02038

Last Updated 04/27/2023 11:19 AM
Project Title

Sycamore Street Water Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Holbrook, MA 02343   (Norfolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Civil Engineer - 03/29/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Contract includes the demolition of the existing 600,000-gallon steel riveted standpipe located on Sycamore Street with a new 250,000-gallon composite elevated water storage tank, including all necessary and incidental appurtenances to complete the work as shown on the Drawings and as specified herein. The Contract duration for this Project shall be 300 calendar days from the Notice to Proceed date. Contract payment will be by the lump sum price method as indicated on the Bid Proposal. No Bidder may withdraw his/her Bid for a period of thirty (30) calendar days after the actual date of the opening of the bids. The bidding and award of the Contract shall be in full compliance with Sections 39M inclusive of Chapter 30 of the General Laws of the Commonwealth of Massachusetts as last revised. This project shall also comply with Sections 39F, 39K, 39N, and 39O of Chapter 30 of the General Laws of the Commonwealth of Massachusetts as last revised.3 Each bid shall also be accompanied by a bid security in the form of a certified, treasurer's or cashier's check or bid bond in the amount of 5 percent of the value of the Bid. Minimum wage rates as determined by the Commissioner of Department of Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Sections 26 to 27G, as amended apply to this project, as contained in Appendix A of the Contract Documents. It is the responsibility of the Contractor, before bid opening, to request, if necessary, any additional information on the Minimum Wage Rates for those trade people who may be employed for the proposed work under this contract. The successful Bidder must furnish 100 percent (100%) Construction Performance Bond and 100 percent (100%) Construction Payment Bond. Complete instructions for filing Bids are included in the Instructions to Bidders, Section 00100 The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder. The Owner reserves the right to waive any informality, to accept or reject, in whole or in part, any or all bids, or take whatever action may be deemed to be in the best interest of the Town of Holbrook. The Owner reserves the right to omit part or whole of any proposed work to be performed, as described in the Contract Documents, as may be required to maintain the total cost of work within available funds.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents