Similar Projects
South Recharge Phase II
Bidding
Less than $8,300,000 est. value
Gilbert, AZ 85233

Pipelining and Drainage Services
Post-Bid
Phoenix, AZ 85007

Broadway Road Bridges at Tempe Canal
Post-Bid
$6,000,000 est. value
Phoenix, AZ 85003

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

Phase 1 - Infrastructure AKA Hillside Drive
New Construction
Construction
Phoenix, AZ 85338

Phoenix Goodyear Airport Drainage Improvements Design Bid Build
Post-Bid
Goodyear, AZ 85338

Colorado River Wash Fan Sediment and Rock Removal IDIQ for Arizona, California and Nevada
Results
$250,000 to $1,000,000 est. value

Hassayampa Sand Filter Replacement Project
Results
$500,000 to $750,000 est. value
Phoenix, AZ

Mcdowell Road Underpass Repair Mcdowell Road Between Higley and Greenfield
Results
Less than $1,432,638 est. value
Mesa, AZ 85211

Grading and Drainage Improvements for Ward Traditional Academy
Results
Tempe, AZ 85282

Palm Lane Drainage - 78th Street to Hawes Road
Results
Less than $3,000,000 est. value
Phoenix, AZ 85003

Harquahala Flood Retarding Structure Erosion Hazard Reduction Project
Results
$2,642,132 to $3,853,304 est. value
Phoenix, AZ 85003

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Professional Services - Alma School Road Improvements (Pecos To Germann) And Gilbert Road Improvements
Results
Chandler, AZ

Last Updated 04/21/2021 03:38 PM
Project Title

Construction Manager at Risk Western Canal Interceptor Rehabilitation

Physical Address View project details and contacts
City, State (County) Tempe, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The CMAR Contractor will be selected for an approximate 5-year program to provide preconstruction and construction services to be managed by the City of Tempe. The construction budget is approximately $3.2M for the manhole and pipeline replacement or rehabilitation work. Multiple contracts may be awarded within the overall program. Figure 1 shows locations of the Recommended Jointly Owned CIP Projects.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents