Similar Projects
Runway 18L-36R Rehabilitation Project
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Greenville, MS 38701

Potable Water System Improvements Phase 3A
Infrastructure
Post-Bid
$550,000 CJ est. value
Greenville, MS 38703

Railcar Bridge and Finishes
Infrastructure
Results
$77,355 CJ est. value
Leland, MS 38756

Breisch Street Bridge Improvements
Infrastructure
Results
$979,230 CJ est. value
Leland, MS 38756

Dollar General #24626 - North Broadway / Greenville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Greenville, MS 38701

Stadium Improvements
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Leland, MS 38756

Home Grant Program
Infrastructure
Post-Bid
$12,000 CJ est. value
Metcalfe, MS 38760

Sewage Line Repair
Infrastructure
Post-Bid
$500,000 CJ est. value
Greenville, MS 38701

Comprehensive Sanitary Sewer Improvements Project - Contract No. 11 2021 Sanitary Sewer Rehabilitation
Infrastructure
Post-Bid
$14,533,731 CJ est. value
Greenville, MS 38701

Comprehensive Sanitary Sewer Improvements Project - Contract No. 3B Pump Station Improvements Phase Two
Renovation, Infrastructure
Results
$3,127,060 CJ est. value
Greenville, MS 38701

2022 Street Improvements
Infrastructure
Post-Bid
$900,000 CJ est. value
Leland, MS 38756

Mill & Overlay - SR 1
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Greenville, MS 38701

Hangar 450- General Improvements
Infrastructure
Results
$2,850,000 CJ est. value
Greenville, MS 38703

Washington County - Road Works
Infrastructure
Bidding
$400,000 CJ est. value
Greenville, MS 38701

Furnish and Install Aluminum Canopy
Infrastructure
Bidding
$250,000 CJ est. value
Stoneville, MS 38776

Last Updated 05/03/2023 05:07 PM
Project Title

Sawcut Asphalt and Install Concrete

Physical Address View project details and contacts
City, State (County) Stoneville, MS 38776   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: The work consists of but is not limited to: The contractor shall provide all labor, equipment, materials, and supervision necessary to: sawcut existing asphalt, excavate existing asphalt and soil, furnish/install compacted crushed limestone, pour Concrete Slab @ 4000 PSI with steel rebar. This project is on the east side of Bldg. #21 at USDA Cotton Ginning Laboratory, located at 111 Experiment Station Road in Stoneville, MS.. All work shall be performed in accordance with the SOW, terms, conditions, drawings, and specifications contained in this document. NOTE: The above general outline of principal features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor and materials required by the plans and specifications. NAICS CODE: 237310 - Davis Bacon Wage Determination will apply. SIZE OF PROJECT: In accordance with FAR 36-204, the estimated price range is between $100,000 and $250,000. SET ASIDE: This procurement is being set aside for Small Business. Proposals are due 5/03/2023, 4:00 PM CT, (COB). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents