Reported 12/01/2020 08:44 AM
Project Title

TMP 102-350 Norwalk River Valley Trail - Phase 2

Physical Address View project details and contacts
City, State (County) Norwalk, CT 06851   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Municipal Agency - 09/28/20
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of the construction of a bituminous concrete trail and a 350 foot long elevated boardwalk and other construction improvements. It will run alongside Riverside Avenue from Union Park South to New Canaan Avenue and will connect two existing trails.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 31 - Earthwork, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents