Similar Projects
Northern Virginia Science Center
New Construction - 70,000 SF
Conception
$75,000,000 est. value
Dulles, VA 20101

New Flagship Museum
New Construction
Conception
$450,000,000 est. value
Fort Belvoir, VA

VMFA Virginia Museum of Fine Arts
Renovation, Addition - 200,000 SF
Design
$190,000,000 est. value
Richmond, VA 23220

Children's Museum of Virginia Elevator Replacement
Renovation
Bidding
Portsmouth, VA 23704

Handicap Restroom Upgrades
Renovation
Bidding
Richmond, VA 23221

Z--FRSP Drainage & Waterproofing Ellwood
Renovation
Post-Bid
$25,000 to $100,000 est. value
Locust Grove, VA 22508

Manassas Museum
Renovation
Post-Bid
$2,500,000 est. value
Manassas, VA 20110

Construction Management at Risk Services for Northern Virginia Science Center
Results
$38,000,000 to $43,000,000 est. value
Dulles, VA 20166

Muscarelle Museum Renovation and Addition
Results
$30,000,000 est. value
Williamsburg, VA

National Army Museum
New Construction - 185,000 SF
Construction
$119,000,000 est. value
Fort Belvoir, VA 22060

Violet Bank Museum
Renovation
Construction
Colonial Heights, VA 23834

Crab Orchard Museum And Pioneer Park Improvements
New Construction, Renovation
Pending Verification
Tazewell, VA 24651

Remodel JS Changing Gallery
Renovation
Bidding
Williamsburg, VA 23185

Jean S. Adams East Museum Exit Canopy and Stairs
Addition, Alteration - 1,642 SF
Post-Bid
Martinsville, VA 24112

Frontier Culture Museum of Virginia - Construct Crossing Gallery
New Construction, Renovation - 56,200 SF
Results
Less than $34,000,000 est. value
Staunton, VA

Last Updated 02/08/2022 10:54 AM
Project Title

VMFA New Expansion and Renovation for CM@Risk

Physical Address View project details and contacts
City, State (County) Richmond, VA 23220   (Richmond City County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed facility includes an approximately 173,000 square foot main building expansion that will include new gallery spaces for African Art, Photography, and 21st century art; a new special exhibitions space with crate and art storage nearby; conference and board rooms; a photography studio; and a special events space with dining facilities and excellent acoustics, able to seat 500 patrons for a seated meal. The project also includes renovating approximately 45,000 square feet of existing facilities, including galleries for European , East Asian, Native American and Pre-Columbian art, as well as the 1936 entrance, Evans Court, and the Raysor Center housed in the former library to allow for improved collections storage, public event hosting, art handling, gallery and theater space, and also better use of administrative spaces.

Details

218,000 SF - Museum, Approximately 45,000 SF Renovation, Approximately 173,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents