Similar Projects
500 Stadium Business Center at SLW
New Construction, Infrastructure - 35,056 SF
Design
$7,500,000 CJ est. value
Port Saint Lucie, FL 34986

Greco Lane Multi-Residential Development / Port St Lucie
New Construction, Infrastructure - 64,063 SF
Design
$13,400,000 CJ est. value
Port St Lucie, FL 34953

Bike Path/Trail
Infrastructure
Bidding
$8,641,273 CJ est. value
Port Saint Lucie, FL 34952

Baling and Recycling Facility Phase IIIB and Phase IVA Landfill Gas System Expansion
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Fort Pierce, FL 34981

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

24-Inch Resilient Wedge Gate Valves
Post-Bid
Fort Pierce, FL 34949

Water and Sewer Monitoring Services
Results
Fort Pierce, Jensen Beach, FL 34981

Lakewood Park Regional Park Potable Water Hookup
Results
Fort Pierce, FL 34951

Speedway #1551 / Port Saint Lucie
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Port St Lucie, FL 34953

Verano South PUD 1, POD D - Plat 2, 3
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Port St Lucie, FL 34953

Indrio Road and I-95 Planned Town Village
New Construction, Infrastructure - 1,088,000 SF
Design
$100,000,000,000 CJ est. value
Fort Pierce, FL 34950

RFQ Contractor - Shore Protection Project Fort Pierce Beach Renourishment 2023
Infrastructure
Bidding
$25,000,000 CJ est. value
Port St Lucie, FL 34987

Singer Valve 2
Infrastructure
Post-Bid
Port Saint Lucie, FL

F-19 Raw Water Main Construction Project
Infrastructure
Results
$1,100,000 est. value
Port Saint Lucie, FL

Living Faith Church Worship Center
New Construction, Infrastructure - 8,050 SF
Pending Verification
$3,000,000 CJ est. value
Port St Lucie, FL 34987

Last Updated 09/20/2022 08:36 AM
Project Title

Naranja Low Pressure & Force Mains Improvements - Phase III

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34983   (Saint Lucie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $397,094 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Port St. Lucie desires to obtain proposals from qualified individuals, firms, and legal entities relative to the Naranja Low Pressure & Force Mains Improvements - Phase III. The Contract period is estimated at two hundred and ten (210) calendar days with no renewal options. It is the intent of the City to enter into a unit price contract with one (1) qualified Contractor to provide all the labor, supervision, equipment, machinery, tools, materials, permits, transportation, utilities, testing services and other incidentals required to complete the work in accordance with the Contract Documents. The Contractor is responsible for the restoration of all areas affected by construction activities to existing conditions or better. The Contractor must have all required licenses and certifications necessary to perform this work. The approved license for this work includes a State of Florida General Contractor License and Underground Utility License. A copy of said certification is to be submitted with the Bid Documents. It is the Contractor's responsibility to verify with the City of Port St. Lucie Building Department that their current license allows them to perform this work prior to submitting a bid. Scope of Work The work is generally described as follows: A new force main replacement and extension along Prima Vista Blvd from its intersection with NE Naranja Avenue to west of the intersection with NE Sandia Drive. The Project entails the installation of approximately 2,450 linear feet of new 6-inch force main along Prima Vista Blvd. starting at NE Naranja Avenue and ending west of Sandia Avenue. The eastern leg of the force main (800 feet) will replace an existing force main and connect to a dry force main (320 feet) located in front of the Wawa convenience store at the intersection of Prima Vista Blvd. and SE Floresta Dr. To the west of the dry force main, approximately 1,300 linear feet of 6-inch force main extension will be constructed along Prima Vista Blvd. to connect to an existing 8-inch force main located downstream of PSLUSD's Lift Station NP-01. The project will be constructed by horizontal directional drill except for the required connections at the ends of the project and connections of the drill lengths, which will be installed by open cut. An approximate 200 linear foot section of bypass will be constructed from the proposed force main to an existing gravity manhole along SE Sandia Dr., which will be valued for use in emergencies. This project is to include all fittings, valves, appurtenances, and pipe associated with the installation of the horizontal directional drill in addition to all fittings, valves, appurtenances, and pipe associated with the open-cut installation of the C-900 PVC force main, connections to the existing force mains, grouting and abandoning in place existing force mains, and obtaining of any required permits. All work shall be in accordance with the Technical Specifications and Construction Plans prepared by Holtz Consulting Engineers, Inc. consisting of pages 1-8 (Attachment A). 21-101 Bid Bond : 5% of the total contract amount

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents